Semantic search

Jump to navigation Jump to search
 Issue dateTitle
CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations13 October 2017Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations
CNL-17-144, Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)20 December 2017Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)10 October 2019License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)
CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)27 July 2020Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)
CNL-20-030, Response to Request for Additional Information to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)29 April 2020Response to Request for Additional Information to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)
CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)23 March 2021Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)
ML1115303282 June 2011Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision
ML11206A49930 June 2011NUREG-0847 Supp 23, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2.
ML11277A14830 September 2011NUREG-0847 Supp 24 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2.
ML12004045115 December 2011Transcript of the ACRS Plant Operation and Fire Protection Subcommittee Meeting, December 15 2011, Pages 1-210 (Open)
ML1204610616 February 2012Minutes of the ACRS Plant Operations and Fire Proctection Subcommittee Meeting December 15, 2011 (Open)
ML14245A38629 August 2014NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014)
ML16131A79513 May 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016
ML19197A09316 July 2019Presentation Slides - Watts Bar Nuclear Plant (WBN) Unit 2, Pre-Submittal Meeting for License Amendment Request Measurement Uncertainty Recapture (Mur) Power Update
ML20083J39512 March 2020NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000)
ML20084M19424 March 2020NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000)
ML20086G48026 March 2020NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2
ML20134J01014 May 2020Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology
ML20226A44421 October 2020Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate
NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 201613 May 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016
WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program16 April 2020Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program
WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)16 December 2020Revised Pressure and Temperature Limits Report (PTLR)
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual11 May 2022Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual
WBL-23-045, 10 CFR 50.59 Summary Report7 November 202310 CFR 50.59 Summary Report
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual8 November 2023Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual