Issue date | Title | |
---|---|---|
IR 05000322/1985027 | 23 August 1985 | Insp Rept 50-322/85-27 on 850628-0802.No Violations Noted. Major Areas Inspected:Startup & Testing Conducted After Issuance of 5% License & Licensee Action on Opening of Primary Containment Purge Valves on 850710 |
IR 05000322/1985030 | 20 September 1985 | Insp Rept 50-322/85-30 on 850803-31.No Violations Noted. Major Areas Inspected:Operations Conducted Under Power Ascension Test Program & Status of Previous Open Items.Four Items Closed & Two New Items Opened |
IR 05000322/1985035 | 2 October 1985 | Insp Rept 50-322/85-35 on 850830-0913.No Violations Noted. Major Areas Inspected:Startup Test Program Activities & Licensee Investigation of Reactor Water Level Indication Problems & Unplanned Reactor Scrams |
IR 05000322/1985098 | 24 November 1986 | Forwards SALP Rept 50-322/85-98 for Mar 1985 - Feb 1986, Initially Forwarded on 860714 & Related Correspondence.Rept Changes Unwarranted Based on 860729 Meeting & Util 860826 Comments.Licensee Overall Performance Acceptable |
IR 05000322/1987002 | 19 February 1987 | Insp Rept 50-322/87-02 on 870117-21.No Violations or Deviations Noted.Major Areas Inspected:Procedure Review,Test Witnessing & Preliminary Results Evaluation of Periodic Containment Integrated Leak Rate Test |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |
ML19296B849 | 2 January 1980 | Responds to IE Bulletin 79-08.Instruction of Licensed Operators Re Events at TMI Have Been Implemeted |
ML20003E846 | 15 April 1981 | Forwards Positions on post-TMI Requirements in NUREG-0737. Info Will Be Contained in Future Amend to FSAR |
ML20009D086 | 21 July 1981 | Forwards Responses to SER Open Items 36,44,52,59,62 & NUREG-0737 Items II.K.3.28 & Item III.D.1.1 |
ML20010C457 | 18 August 1981 | Forwards Response to NRC Requests for Info Re NUREG-0737 Item II.K.3.28 & SER Open Items 11,36 & 44 |
ML20042C128 | 24 March 1982 | BWR Control Rod Drive Sys Vessel Inventory Makeup Rate Aspects of NUREG-0619. |
ML20042C306 | 26 March 1982 | Response to 820305 Interrogatories & 820306 Second Set of Interrogatories |
ML20054J212 | 24 June 1982 | Transcript of 820624 OL Hearing in Riverhead,Ny.Pp 5,340- 5,533.Supporting Documentation Encl |
ML20054M198 | 16 July 1981 | Forwards Responses to Request for Addl Info Re SER Open Items & NUREG-0737,Items II.B.7,II.F.2 & II.K.3.27 |
ML20065T942 | 30 September 1982 | Review of Shoreham Water Level Measurement Sys |
ML20066F908 | 15 November 1982 | Status Rept on Issues Currently Available for Settlement,Per ASLB Request.Certificate of Svc Encl.Related Correspondence |
ML20066H630 | 4 November 1982 | Submits Results of plant-specific Application of BWR Owners Group Generic Rept Recommendations Re Inadequate Core Cooling (SER Item II.F.2).Deletion of in-core Thermocouple Requirement Justified |
ML20070M135 | 7 January 1983 | Forwards Revised Procedure Sp 29.023.03, Containment Control Emergency Procedure, in Response to ASLB Request for Procedures Re Maint Effective on Date of ICC Resolution Agreement on Inadequate Core Cooling.Related Correspondence |
ML20072B876 | 17 May 1983 | Forwards Response to Forwarding IE Insp Rept 50-322/83-08 & App B Addressing Notice of Deviation Re IE Bulletin 80-06, ESF Reset Controls |
ML20076F940 | 17 May 1983 | Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-322/83-08.Corrective Actions:Util Startup Personnel Reviewed Field Installation of Internal Wiring to Verify Wiring Installation |
ML20077B891 | 19 July 1983 | Provides Description of Mods to Portion of Reactor Vessel Water Level Measurement Sys & ECCS Initiation Logic,Based on Agreement Reached During ASLB Hearings |
ML20082G897 | 9 August 1991 | Lilco Responses to Petitioner Filings of 910805 & 06.* W/Certificate of Svc |
ML20083R019 | 20 April 1984 | Testimony of WE Gunther Re Steps Involved in Phases of Low Power Testing |
ML20087C641 | 2 March 1984 | Reply Brief Re Contentions 7B on Classification & Sys Interactions & 12-15 on Qa/Qc.Certificate of Svc Encl |
ML20087H792 | 20 March 1984 | Supplemental Motion for Low Power Ol.Unexecuted Affidavits of Ja Notaro,Wg Schiffmacher,Gg Sherwood,As Rao & EC Eckert Encl.Certificate of Svc Also Encl |
ML20087M983 | 30 March 1984 | Affidavit of Ja Notaro & WE Gunther in Support of 840320 Supplemental Motion for Low Power OL |
ML20094C344 | 3 August 1984 | Statement of Matl Facts in Support of Util Motion for Summary Resolution of ASLB 840724 Order.Unexecuted Affidavits & Certificate of Svc Encl |
ML20099G631 | 20 November 1984 | Petition for Commission Review of ALAB-788.Dismissal of Phase I Emergency Planning Contentions Should Be Reversed & Hearing Ordered.Certificate of Svc Encl |
ML20100J253 | 28 February 1985 | Emergency Diesel Generator Loading Analysis Plan |
ML20108B691 | 4 March 1985 | Petition for Review of ALAB-800,reversing ASLB Disposition of Security Contention & Vacating Authorization for Phase III & IV Low Power Testing License.Affidavit of Jl Leonard & Certificate of Svc Encl |
ML20112H128 | 15 January 1985 | Testimony of Fg Dawe,Ja Notaro & Ej Youngling Re Suffolk County & State of Ny Contention on Tdi Diesel Generator Qualified Load.Related Correspondence |
ML20112H490 | 15 January 1985 | Testimony of Gf Dawe,Ja Notaro & Ej Youngling Re Diesel Generator Qualified Load.Related Correspondence |
ML20117H926 | 13 May 1985 | Affidavit of Ja Notaro & WE Gunther Re Steps Involved in Sys Testing During Phases I-IV |
ML20127B005 | 27 October 1983 | Forwards PRA Review of BWR Water Level Measurement Sys Provided in BWR Owners Group Repts SLI-8218 & SLI-8221. PRA Results Not Generically Applicable to All BWR Plants |
ML20127B557 | 19 June 1985 | Response Opposing Suffolk County & State of Ny 850617 Motion for Stay of Low Power License.Motion Untimely & Fails to Satisfy Commission Stay Criteria.Unexecuted Affidavit of Jd Leonard & Certificates of Svc Encl |
ML20128H188 | 24 June 1985 | Affidavit of Jd Leonard Re Issuance of Low Power License. Certificate of Svc Encl |