Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
IR 05000335/2001007 | 7 March 2002 | IR 05000335/2001-007 & IR 05000389/2001-007 for Inspection on 02/01/2002 Related to Safety System Design & Performance Capability. No Violations Noted | Ogle C NRC/RGN-II/DRS/EB | NextEra Energy Stall J |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | 5 February 1996 | Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-49, Thermally Induced Pressurization of Nuclear Power Facility Piping | 20 August 1996 | Thermally Induced Pressurization of Nuclear Power Facility Piping | Martin T Office of Nuclear Reactor Regulation | |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections | Martin T Office of Nuclear Reactor Regulation | |
L-2017-074, Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 6, Engineered Safety Features | 3 May 2017 | Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 6, Engineered Safety Features | NextEra Energy | Office of Nuclear Reactor Regulation |
L-2018-172, Redacted St. Lucie, Unit 1, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | 4 October 2018 | Redacted St. Lucie, Unit 1, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | NextEra Energy | Office of Nuclear Reactor Regulation |
ML14084A568 | 25 March 2014 | Updated Final Safety Analysis, Chapter 5, Section 5.0, 5.1, 5.2. 5.4; Includes Up to UFSAR Amendment No. 21 | Lisa Regner Plant Licensing Branch II | |
ML17228B297 | 11 October 1995 | Provides Initial Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. | NextEra Energy Sager D | Office of Information Resources Management |
ML17228B550 | 5 January 1996 | Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period 940423-960105. | NextEra Energy | |
ML17228B587 | 31 July 1996 | Responds to RAI Concerning GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves. Summary of Requested Calculation Encl | NextEra Energy Stall J | Office of Information Resources Management |
ML17229A169 | 11 December 1996 | Status Meeting on 961211. | NextEra Energy | |
ML17229A537 | 25 May 1997 | Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 960106-970525. | NextEra Energy | |
ML17241A337 | 20 May 1999 | Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 | NextEra Energy Stall J | Office of Information Resources Management |
ML17241A352 | 1 June 1999 | Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status | NextEra Energy Stall J | Office of Information Resources Management |
ML17241A470 | 25 September 1999 | Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant | NextEra Energy Stall J | Office of Information Resources Management |
ML17298A048 | 3 May 2017 | Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 6, Engineered Safety Features | NextEra Energy | Office of Nuclear Reactor Regulation |
ML17309A821 | 13 February 1996 | Provides 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. | NextEra Energy Bohlke W | Office of Information Resources Management |
ML20202E026 | 23 April 1997 | Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) Barr K | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) Uryc B |
ML20268A125 | 11 September 2020 | Amendment 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | NextEra Energy | Office of Nuclear Reactor Regulation |
ML22013A661 | 11 November 2021 | Amendment 31 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | NextEra Energy | Office of Nuclear Reactor Regulation |
ML22094A167 | 1 April 2022 | 2022 St. Lucie POV Inspection Information Request | NRC Region 2 Geoffrey Ottenberg | NextEra Energy Falkiewicz T |
ML22111A113 | 4 March 2022 | Amendment 27 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | NextEra Energy | Office of Nuclear Reactor Regulation |
ML23096A026 | 1 April 2023 | Amendment 32 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | NextEra Energy | Office of Nuclear Reactor Regulation |
NRC Generic Letter 1995-07 | 17 August 1995 | NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves | Crutchfield D Office of Nuclear Reactor Regulation |