Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000528/LER-2011-002 | Nonconforming Condition Renders the Qualified Safety Parameter Display System Inoperable | |
ENS 45425 | Reactor Water Level Indication Inoperable | |
IR 05000528/1992035 | 1 December 1992 | Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
LD-85-033, Forwards Comments on Proof & Review Tech Specs,Per 850703 Request.Concurs W/Proposed Tech Specs.Ltr from Northeast Utils to NRC & marked-up Tech Specs Encl.Responses to Questions Per Being Prepared | 18 July 1985 | Forwards Comments on Proof & Review Tech Specs,Per 850703 Request.Concurs W/Proposed Tech Specs.Ltr from Northeast Utils to NRC & marked-up Tech Specs Encl.Responses to Questions Per Being Prepared |
ML011010325 | 16 March 2001 | . Docket Nos. Stn 50-528/529/530 Emergency Plan Implementing Procedure Update. EPIP-07 |
ML022600311 | 11 September 2002 | APS, Palo Verde Units 1, 2, and 3, Technical Specifications Bases Revision 18 Update |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |
ML051650324 | 2 June 2005 | Technical Specification Bases Revisions, 30, 31, 32, and 33 Update |
ML053110045 | 21 April 2011 | Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017 |
ML071040017 | 28 April 1994 | 59 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations |
ML080710546 | 29 February 2008 | Palo Verde Nuclear Generating Station (Pvngs), Units 1, 2, and 3, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor |
ML090350212 | 15 January 2009 | Amendment Request for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process |
ML090830334 | 13 March 2009 | Revision 1 to Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
ML103350646 | 10 November 2010 | Technical Specification Bases, Revision 53 |
ML110610763 | 26 January 2011 | PVNGS Technical Specification Bases, Revision 54 |
ML110871955 | 21 April 2011 | License Renewal - Appendices a, B, C, and D to the Renewed Operating License for Unit 1 (NPF-41) |
ML11103A053 | 31 March 2011 | License Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program |
ML11287A034 | 1 September 2011 | Technical Specification Bases Revision 55 |
ML12193A041 | 30 May 2012 | Technical Specification Bases, Revision 56 |
ML12193A042 | 25 May 2012 | Insertion Instructions Technical Specifications Bases, Revision 56, Summary of Changes |
ML13120A501 | 10 April 2013 | Technical Specification Bases, Revision 57 |
ML13217A055 | 3 July 2013 | Enclosure 1 - Technical Specifications Bases, Revision 58 |
ML13357A218 | 18 December 2013 | Revision 2 to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML14091A956 | 19 March 2014 | Technical Specification (TS) Bases Revision 59 |
ML14255A063 | 29 August 2014 | Technical Specification Bases, Revision 60 |
ML15027A122 | 19 December 2014 | Technical Specification (TS) Bases Revision 61 |
ML15139A300 | 24 April 2015 | Technical Specification Bases (TS Bases), Revision 62 |
ML15293A335 | 9 October 2015 | Independent Spent Fuel Storage Installation (ISFSI) - Request for NRC Approval of Proposed Changed to Emergency Action Levels |
ML16083A250 | 23 March 2016 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Official RAIs for EAL LAR |
ML16133A621 | 12 May 2016 | ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action Levels |
ML16154A614 | 12 May 2016 | PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 |
ML17263B249 | 15 September 2017 | Emergency Plan, Rev. 59. Part 2 of 2 |
ML17269A264 | 21 September 2017 | Enclosure 1: Palo Verde, Units 1, 2, and 3, and ISFSI - Emergency Plan, Revision 60 |
ML17296A440 | 28 September 1979 | Forwards TMI-2 Lessons Learned Implementation Rept. |
ML17300A286 | 23 July 1986 | Proposed Tech Specs,Eliminating Typos,Providing Clarification,Improving Consistency & Adjusting Nomenclature |
ML17300A748 | 30 March 1987 | Special Rept 2-SR-87-007:on 870312,time Limit for Restoring Channel of Reactor Vessel Water Level Instrumentation Exceeded.Cause of Inoperability Under Investigation.Channel Expected to Be Returned to Svc at Next Refueling Outage |