Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17054B163 | 6 September 1984 | Milestone Schedule:Integrated Flush Summary Schedule. | |
ML17054B165 | 6 September 1984 | Milestone Schedule:Integrated Flush Summary Schedule. | |
ML17054B964 | 11 October 1985 | P&Id:Residual Heat Removal Sys. Sheet 1 of 2 | |
ML17055E057 | 22 December 1986 | Reactor Shutdown Cooling P&I Diagram, as-built.Sheet 1 of 2 | |
ML17055E058 | 4 December 1987 | Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 11-11,12-12,13-13. Sheet 6 | |
ML17055E059 | 23 December 1986 | Reactor Building Drywell Penetrations Details, as-built | |
ML17055E060 | 28 July 1988 | Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Upper Plan & Section 4-4. Rev Date Illegible | |
ML17055E061 | 29 October 1987 | Reactor Building Sampling Sample Station Details, as-built | |
ML17055E062 | 28 July 1988 | Reactor Bldg Closed LOOP Cooling Sys Piping at Reactor Recirc Pumps & Motors Section 1-1. Rev Date Illegible | |
ML17055E063 | 28 July 1988 | Reactor Bldg Drywell & Torus Continuous Leak Rate Monitoring Sys Lowering Instr RM El 237.0 Feet. Rev & Rev Date Illegible | |
ML17055E064 | 28 July 1988 | Reactor Bldg East Instr Room El 284 FEET-0 Inches Instrumentation & Misc Piping. | |
ML17055E065 | 28 July 1988 | Reactor Building Emergency Condenser Piping Penetration Details X-34 & X-38 10 Feet Steam Supply. Sheet 1 of 3 | |
ML17055E066 | 5 March 1985 | Reactor Building Instrument & Metering Piping Core Spray Sys. Sheet 1 of 3 | |
ML17055E067 | 22 November 1985 | Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 2-2. Sheet 3 | |
ML17055E068 | 28 July 1988 | Reactor Bldg Breathing Air & House Service Air. | |
ML17055E069 | 28 July 1988 | Reactor Bldg Liquid Poison System Sections 1-1,2-2,3-3,4-4 & 5-5. Rev Date Illegible | |
ML20259D037 | 28 August 1987 | Reactor Core Spary Sys 40 Piping Isometric from External Isolation Valve to Reactor | |
ML20259D040 | 8 December 1988 | Reactor Bldg Core Spray Piping Plan at El 198 Ft & 218 Ft. Rev Date Illegible | |
ML20259D044 | 11 February 1988 | Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps to Ext Isolation Valves. Sheet 2 | |
ML20259D048 | 11 February 1988 | Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps & from Topping Pumps to Ext Isolation Valves. Sheet 3 | |
ML20259D053 | 22 February 1987 | Condensate MAKE-UP to Main Condenser from Storage Surge Tanks Sys 59 Piping Isometric | |
ML20259D056 | 24 November 1987 | Condensate Flow P&I Diagram | |
ML20259D063 | 8 December 1988 | Turbine Bldg Condensate Storage & Surge Tank. Rev Date Illegible | |
ML20259D068 | 8 December 1988 | 2 Aluminum Cone Roof Condensate Storage Tanks 30-OD & 42 Hg | |
ML20260K840 | 2 June 1989 | Reactor Core Spray P & I Diagram | |
ML20260K843 | 9 September 1989 | Closed LOOP Cooling Service Water and Screen Wash Turbine Bldg and Screen House P & I Daigram. Sheet 1 of 4 | |
ML20260K847 | 9 September 1989 | Closed LOOP Cooling Service Water and Screen Wash Trubine Bldg and Screen House P & I Diagram. Sheet 2 of 4 | |
ML20260K851 | 29 March 1989 | Closed LOOP Cooling & Service Water Reactor & Waste Bldg'S P & I Diagram. Sheet 3 of 4 | |
ML20260K856 | 5 August 1989 | Closed LOOP Cooling & Service Water Reactor & Waste Bldg P & I Diagram. Sheet 4 of 4 | |
ML20262H352 | 15 June 1982 | Reactor Cont (Drywell & Torus) Inert Gas (N2) Purge and Fill Drywell Cooling Sys P&I Diagram. Sheet 1 | |
ML20262H355 | 28 February 1981 | Reactor Vessel Instrumentation P&I Diagram | |
ML20262H358 | 16 September 1981 | Emergency Cooling System P&I Diagram | |
ML20262H359 | 1 February 1982 | Reactor Recirculation Loops (Typical of 5) P&I Diagram, as-built | |
ML20262H362 | 15 June 1982 | Drywell & Torus Leak Rate & Analyzer System TIP Sys - Electrcal Pen & N2 Supply P&I Diagram. Sheet 2 | |
ML20263N820 | 11 January 1984 | Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 1 | |
ML20263N823 | 10 March 1982 | Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 2 | |
ML20263N826 | 26 March 1984 | Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 3.Rev Date Illegible | |
ML20263N827 | 11 August 1982 | Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 4 | |
ML20263N830 | 10 March 1982 | Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 1 | |
ML20263N832 | 10 March 1982 | Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 2 | |
ML20263N835 | 8 November 1983 | Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 3 | |
ML20263N837 | 10 March 1982 | Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 4 | |
ML20263N840 | 8 November 1983 | Instr Piping:Turbine Bldg Miscellaneous | |
ML20263N842 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 1 | |
ML20263N845 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 2 | |
ML20263N848 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 3 | |
ML20263N850 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 4 | |
ML20263N852 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 1 | |
ML20263N855 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 2 | |
ML20263N857 | 13 January 1982 | Instr Air Supply Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 3 |