 Issue dateTitleTopic
ML17054B1636 September 1984Milestone Schedule:Integrated Flush Summary Schedule.
ML17054B1656 September 1984Milestone Schedule:Integrated Flush Summary Schedule.
ML17054B96411 October 1985P&Id:Residual Heat Removal Sys. Sheet 1 of 2
ML17055E05722 December 1986Reactor Shutdown Cooling P&I Diagram, as-built.Sheet 1 of 2
ML17055E0584 December 1987Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 11-11,12-12,13-13. Sheet 6
ML17055E05923 December 1986Reactor Building Drywell Penetrations Details, as-built
ML17055E06028 July 1988Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Upper Plan & Section 4-4. Rev Date Illegible
ML17055E06129 October 1987Reactor Building Sampling Sample Station Details, as-built
ML17055E06228 July 1988Reactor Bldg Closed LOOP Cooling Sys Piping at Reactor Recirc Pumps & Motors Section 1-1. Rev Date Illegible
ML17055E06328 July 1988Reactor Bldg Drywell & Torus Continuous Leak Rate Monitoring Sys Lowering Instr RM El 237.0 Feet. Rev & Rev Date Illegible
ML17055E06428 July 1988Reactor Bldg East Instr Room El 284 FEET-0 Inches Instrumentation & Misc Piping.
ML17055E06528 July 1988Reactor Building Emergency Condenser Piping Penetration Details X-34 & X-38 10 Feet Steam Supply. Sheet 1 of 3
ML17055E0665 March 1985Reactor Building Instrument & Metering Piping Core Spray Sys. Sheet 1 of 3
ML17055E06722 November 1985Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 2-2. Sheet 3
ML17055E06828 July 1988Reactor Bldg Breathing Air & House Service Air.
ML17055E06928 July 1988Reactor Bldg Liquid Poison System Sections 1-1,2-2,3-3,4-4 & 5-5. Rev Date Illegible
ML20259D03728 August 1987Reactor Core Spary Sys 40 Piping Isometric from External Isolation Valve to Reactor
ML20259D0408 December 1988Reactor Bldg Core Spray Piping Plan at El 198 Ft & 218 Ft. Rev Date Illegible
ML20259D04411 February 1988Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps to Ext Isolation Valves. Sheet 2
ML20259D04811 February 1988Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps & from Topping Pumps to Ext Isolation Valves. Sheet 3
ML20259D05322 February 1987Condensate MAKE-UP to Main Condenser from Storage Surge Tanks Sys 59 Piping Isometric
ML20259D05624 November 1987Condensate Flow P&I Diagram
ML20259D0638 December 1988Turbine Bldg Condensate Storage & Surge Tank. Rev Date Illegible
ML20259D0688 December 19882 Aluminum Cone Roof Condensate Storage Tanks 30-OD & 42 Hg
ML20260K8402 June 1989Reactor Core Spray P & I Diagram
ML20260K8439 September 1989Closed LOOP Cooling Service Water and Screen Wash Turbine Bldg and Screen House P & I Daigram. Sheet 1 of 4
ML20260K8479 September 1989Closed LOOP Cooling Service Water and Screen Wash Trubine Bldg and Screen House P & I Diagram. Sheet 2 of 4
ML20260K85129 March 1989Closed LOOP Cooling & Service Water Reactor & Waste Bldg'S P & I Diagram. Sheet 3 of 4
ML20260K8565 August 1989Closed LOOP Cooling & Service Water Reactor & Waste Bldg P & I Diagram. Sheet 4 of 4
ML20262H35215 June 1982Reactor Cont (Drywell & Torus) Inert Gas (N2) Purge and Fill Drywell Cooling Sys P&I Diagram. Sheet 1
ML20262H35528 February 1981Reactor Vessel Instrumentation P&I Diagram
ML20262H35816 September 1981Emergency Cooling System P&I Diagram
ML20262H3591 February 1982Reactor Recirculation Loops (Typical of 5) P&I Diagram, as-built
ML20262H36215 June 1982Drywell & Torus Leak Rate & Analyzer System TIP Sys - Electrcal Pen & N2 Supply P&I Diagram. Sheet 2
ML20263N82011 January 1984Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 1
ML20263N82310 March 1982Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 2
ML20263N82626 March 1984Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 3.Rev Date Illegible
ML20263N82711 August 1982Instr Piping:Turbine Bldg Plan El 250 Ft. Sheet 4
ML20263N83010 March 1982Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 1
ML20263N83210 March 1982Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 2
ML20263N8358 November 1983Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 3
ML20263N83710 March 1982Instr Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 4
ML20263N8408 November 1983Instr Piping:Turbine Bldg Miscellaneous
ML20263N84213 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 1
ML20263N84513 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 2
ML20263N84813 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 3
ML20263N85013 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 250 Ft. Sheet 4
ML20263N85213 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 1
ML20263N85513 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 2
ML20263N85713 January 1982Instr Air Supply Piping:Turbine Bldg Plan El 277 Ft 6 Inches. Sheet 3