Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
A06182, Responds to 861029 Request for util-proposed Tech Spec Changes Re Reporting of Safety Valve & Relief Valve Failure & Challenges,Control Room Habitability & Secondary Water Chemistry.Schedule for Submittal of Amend Requests Encl | 10 December 1986 | NORTHEAST UTILITIES Mroczka E Northeast Nuclear Energy | Responds to 861029 Request for util-proposed Tech Spec Changes Re Reporting of Safety Valve & Relief Valve Failure & Challenges,Control Room Habitability & Secondary Water Chemistry.Schedule for Submittal of Amend Requests Encl | Request |
B12620, Proposed Tech Specs,Revising Page 6-19 to Add or Reclose to Requirements for Submittal of Annual Repts | 31 July 1987 | Northeast Nuclear Energy | Proposed Tech Specs,Revising Page 6-19 to Add or Reclose to Requirements for Submittal of Annual Repts | Other |
ML20077B854 | 20 July 1983 | Overbeck G FRANKLIN INSTITUTE Delgaizo T Delgazio T | Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept | Other |
ML20214K567 | 19 April 1983 | Office of Nuclear Reactor Regulation Colburn T | Advises That Reporting Period Began on 800401 for All PWR Licensees Committed to Providing NRC Prompt Notification of Porv/Sv Failures & Periodic Repts.Project Managers Should Have Info Available in Records | Other |