Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
CAC:MF0712 | 4 August 2017 | 4 August 2017 | |
CAC:MF3772 | 15 December 2016 | 26 January 2017 | |
CAC:MF3868 | 7 March 2016 | 11 October 2016 | |
CAC:MF4479 | 23 December 2015 | 3 April 2019 | |
CAC:MF4588 | 22 November 2016 | 22 November 2016 | |
CAC:MF5026 | TSTF-37 TSTF-30 TSTF-45 TSTF-46 Clarify SR on Bypass of DG Automatic Trips Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Modify Section 3.8 Mode Restriction Notes Allow Administrative Means of Position Verification for Locked or Sealed Valves Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration Control Rod SCRAM Time Testing 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS SFDP Clarifications Add Met Vs. Perform to Specification 1.4, Frequency Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration Determination of Cumulative and Projected Dose Contributions in Recp Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions Secondary Containment and Shield Building Boundary Integrity SRS EFCV Completion Time to 72 Hours Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO Removing Restart of Shutdown Clock for Increasing Suppression Pool Temperature Clarify the Control Rod Block Instrumentation Required Action | 26 August 2016 | 21 June 2019 |
CAC:MF5579 | Generic Letter 2008-01, Managing Gas Accumulation | 28 October 2015 | 14 April 2016 |
CAC:MF6063 | 2 April 2015 | 15 June 2021 | |
CAC:MF6238 | 4 May 2015 | 30 December 2015 | |
CAC:MF6453 | 2 July 2015 | 18 December 2015 | |
CAC:MF6494 | 28 December 2015 | 28 December 2015 | |
CAC:MF6580 | Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | 4 August 2015 | 7 March 2016 |
CAC:MF6611 | 11 August 2015 | 29 August 2017 | |
CAC:MF6670 | 2 December 2015 | 14 March 2017 | |
CAC:MF6681 | 29 January 2016 | 29 January 2016 | |
CAC:MF6985 | 15 October 2015 | 30 September 2016 | |
CAC:MF7197 | Technical Specifications End States, NEDC-32988-A | 11 April 2016 | 19 December 2016 |
CAC:MF7460 | 3 March 2016 | 16 March 2017 | |
CAC:MF7466 | TSTF-65 | 17 May 2016 | 13 January 2017 |
CAC:MF7692 | 6 May 2016 | 16 May 2016 | |
CAC:MF7696 | Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR | 5 May 2016 | 24 August 2017 |
CAC:MF7736 | 17 June 2016 | 30 June 2016 | |
CAC:MF7834 | 13 June 2018 | 13 June 2018 | |
CAC:MF7932 | 13 April 2017 | 13 April 2017 | |
CAC:MF8110 | Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | 1 July 2016 | 30 November 2017 |
CAC:MF8141 | 6 July 2016 | 23 November 2016 | |
CAC:MF8176 | 1 September 2016 | 30 June 2017 | |
CAC:MF8309 | 29 August 2016 | 6 January 2017 | |
CAC:MF8890 | 27 June 2017 | 27 June 2017 | |
CAC:MF9022 | 26 October 2017 | 26 October 2017 | |
CAC:MF9024 | 10 January 2017 | 29 March 2017 | |
CAC:MF9027 | 27 December 2016 | 20 October 2017 | |
CAC:MF9043 | 9 January 2017 | 15 February 2017 | |
CAC:MF9271 | 17 February 2017 | 10 August 2017 | |
CAC:MF9350 | 21 April 2017 | 21 April 2017 | |
CAC:MF9435 | 7 November 2017 | 26 September 2018 | |
CAC:MF9590 | 7 April 2017 | 22 January 2018 | |
CAC:MF9662 | 20 April 2017 | 31 May 2018 | |
CAC:MF9753 | 22 January 2018 | 22 January 2018 | |
CAC:MF9812 | 5 June 2017 | 16 April 2018 | |
CAC:MF9851 | 14 July 2017 | 14 July 2017 | |
CAC:MF9868 | 13 March 2018 | 13 March 2018 | |
CAC:MF9942 | 3 July 2017 | 13 April 2018 | |
CAC:MF9944 | 3 July 2017 | 25 January 2018 | |
CAC:MF9997 | 10 July 2017 | 29 August 2018 | |
CAC:MG0071 | 3 August 2017 | 15 June 2018 | |
CAC:MG0188 | 25 January 2018 | 26 July 2018 | |
EPID:L-2017-LLA-0215 | TSTF-542 | 14 September 2017 | 21 June 2019 |
EPID:L-2017-LRO-0054 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors | 30 March 2017 | 8 November 2017 |
EPID:L-2018-LEM-0047 | Revision to Technical Specification 3.6.4.1 -Secondary Containment | 17 October 2018 | 30 April 2019 |