Issue date | Title | Topic | |
---|---|---|---|
ML19263F627 | 5 May 1977 | Station Single Line Diagram, as-built | |
ML20259E338 | 9 November 1982 | Functional Description & Logic Diagram:Condensate Feedwater Sys. Sheet 3 of 4. Actual Rev STATUS:10-1 | |
ML20259E342 | 9 November 1982 | Schematic Diagram:Efic Trip Interface Equipment Trip Relay Assembly Internal Wiring | |
ML20259E345 | 9 November 1982 | Schematic Diagram:Emergency Feedwater Steam Generator Isolation Valves. Sheet 1 of 2. Actual Rev STATUS:1-1 | |
ML20259E349 | 8 November 1982 | Schematic Diagram:Limit & Torque Switch Development for MOVs & Sovs. Sheet 2 of 2. Actual Rev STATUS:1-1 | |
ML20259E353 | 8 June 1982 | Schematic Diagram:Emergency FW Motor Driven Pummps. Actual Rev STATUS:8-1 | |
ML20259E357 | 27 October 1982 | Schematic Diagram:Emergency Feedwater Steam Generator Isolation Valves. Sheet 2 of 2 | |
ML20259E361 | 31 October 1982 | Schematic Diagram:Emergency Feedwater Turbine Movs. Sheet 4 of 4 | |
ML20259E366 | 25 October 1982 | Schematic Diagram:Emergency Feedwater Turbine Movs. Sheet 3 of 4 | |
ML20259E370 | 30 October 1982 | Schematic Diagram:Steam Generator Isolation Control. Sheet 4 of 5. Actual Rev STATUS:1-1 | |
ML20259E375 | 25 October 1982 | Schematic Diagram:Steam Generator Isolation Control. Sheet 1 of 5. Actual Rev STATUS:2-1 | |
ML20259E380 | 5 November 1982 | Schematic Diagram:Emergency FW Turbine Movs. Actual Rev STATUS:17-2 | |
ML20261K140 | 8 June 1982 | Schematic Diagram:Emergency FW Motor Driven Pumps, as-built | |
ML20263F296 | 11 December 1980 | Schematic Diagram:Reactor Coolant System High Point Vents. Sheet 3 of 3.Actual Revision Number Is N-1 | |
ML20263F299 | 11 December 1980 | Schematic Diagram:Reactor Coolant System High Point Vents. Sheet 2 of 3.Actual Revision Number Is N-1 | |
ML20263F301 | 11 December 1980 | Schematic Diagram:Reactor Coolant System High Point Vents. Sheet 1 of 3.Actual Revision Number Is N-1 | |
ML20263F306 | 25 February 1981 | Schematic Diagram:Reactor Coolant System High Point Vents. Sheet 1 of 2.Actual Revision Number Is N-1 | |
ML20263R467 | 27 November 1978 | Schematic Diagram:480V ESF Motor Control Centers Control Transformers. Sheet 4 of 5 | |
ML20263S790 | 31 August 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 386 Ft. (Actual Revision Status 15-3 FCN1 Revision 1.) | |
ML20263S794 | 31 August 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 404 Ft & 420 Ft. (Actual Revision Status 12-1 FCN1 Revision 1.) | |
ML20263S797 | 1 September 1981 | Lighting & Communication Auxiliary Bldg & Tendon Gallery El 317 Ft. (Actual Revision Status 5-1 Revision 0.) | |
ML20263S800 | 1 September 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 335 Ft. (Actual Revision Status 11-2 Revision 0.) | |
ML20263S804 | 31 August 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 335 Ft & 354 Ft. (Actual Revision Status 15-1 Revision 0.) | |
ML20263S808 | 31 August 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 368 Ft & 372 Ft. (Actual Revision Status 7-2 Revision 0.) | |
ML20263S811 | 31 August 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 386 Ft. (Actual Revision Status 15-3 Revision 0.) | |
ML20263S815 | 31 August 1981 | Lighting & Communication Turbine & Auxiliary Bldg El 404 Ft & 422 Ft. (Actual Revision Status 12-1 Revision 0.) | |
ML20263S819 | 1 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 404 Ft & 422 Ft. (Actual Revision Status 12-1 FCN1.) | |
ML20263S827 | 1 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 329 Ft & 335 Ft. (Actual Revision Status 22-1 FCN1.) | |
ML20263S830 | 1 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 363 Ft 6 Inches Thru El 372 Ft. (Actual Revision Status 16-1 FCN1.) | |
ML20263S838 | 2 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 386 Ft. (Actual Revision Status 24-2.) | |
ML20263S842 | 1 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 329 Ft & 335 Ft. (Actual Revision Status 22-1.) | |
ML20263S846 | 1 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 404 Ft & 422 Ft. (Actual Revision Status 12-1.) | |
ML20263S854 | 3 September 1981 | Lighting & Communication Turbine & Auxiliary Building El 335 Ft & 354 Ft. (Actual Revision Status 20-1.) | |
ML20263S857 | 1 September 1981 | Lighting & Communication Auxiliary Bldg & Tendon Gallery El 317 Ft. (Actual Revision Status 6-1.) | |
ML20263S859 | 1 September 1981 | Lighting & Communication Turbine and Auxiliary Building El 363 Ft 6 Inches Thru El 372 Ft. (Actual Revision Status 16-1.) |