Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20259D501 | 14 May 1979 | Turbine Oil Reservoir:Baffle Details | |
ML20259D505 | 11 May 1979 | Turbine Oil Reservoir:Berm Details | |
ML20259D510 | 21 June 1979 | Fire Protection Sys | |
ML20259D514 | 27 July 1979 | Radwaste Disposal Piping:Underground. Sheet 2 | |
ML20259D519 | 27 July 1979 | Machine Location Plan,Ground Floor Turbine Room | |
ML20259D524 | 19 January 1960 | Miscellaneous Drain Piping:Primary Auxiliary Bldg. Sheet 2 | |
ML20259D529 | 21 August 1979 | Flow Diagram:Fire Protection Sys | |
ML20259D533 | 9 January 1979 | Machine Location,Diesel Generator Bldg | |
ML20259D536 | 18 July 1977 | Machine Location,Primary Auxiliary Bldg. Sheet 2 | |
ML20259D541 | 15 April 1962 | Machine Location Plan,Primary Auxiliary Bldg. Sheet 1 | |
ML20259D546 | 15 April 1960 | Automatic Sprinkler,Fogfoam,Foam & Waterfog Sys | |
ML20259D551 | 7 July 1979 | Fire Protection Sys:Sprinkler Layout | |
ML20259D555 | 18 June 1979 | General Arrangement:Yard | |
ML20259D559 | 26 September 1978 | Machine Location Plan:Ground Floor Turbine Room | |
ML20259D564 | 22 June 1961 | Radwaste Disposal Piping:Underground. Sheet 1 | |
ML20259D569 | 11 January 1978 | Foundation Plan & Details,Diesel Generator Bldg. Sheet 1 | |
ML20259D574 | 12 December 1977 | Machine Location Plan:Mezzanine Floor Turbine Room | |
ML20259D579 | 22 August 1978 | Water & Fire Protection:Underground. Sheet 1 | |
ML20259D584 | 24 February 1978 | Plumbing,Roof Drainage & Fire Protection:Turbine Area. Sheet 2 | |
ML20259D588 | 10 February 1959 | Plan & Details:Primary Auxiliary Bldg. Sheet 7 | |
ML20259D592 | 10 July 1959 | Plan & Details:Primary Auxiliary Bldg. Sheet 4 | |
ML20259D596 | 3 March 1978 | Plan & Details:Primary Auxiliary Bldg. Sheet 11 | |
ML20259D600 | 1 October 1959 | Plan & Details:Primary Auxiliary Bldg. Sheet 15 | |
ML20260H863 | 7 July 1977 | Flow Diagram Lpsi,Hpsi & Nitrogen | |
ML20261F421 | 21 June 1979 | Site Clearing | |
ML20262J923 | 20 November 1970 | Revised Arrangement Safety Inj & Shield Tank Cavity Water Piping. Sheet 1 | |
ML20262J925 | 14 February 1962 | Detail of Pipe Supports in Vapor Container, as-built | |
ML20262J926 | 11 January 1979 | 2400V One Line Diagram | |
ML20262J933 | 11 January 1979 | Schematic Diagram - Meters Relays & Synchronizing | |
ML20262J936 | 2 March 1979 | 480V One Line Diagram. Sheet 4 | |
ML20262J939 | 11 April 1960 | Electrical Penetrations. Sheet 2 | |
ML20262J940 | 30 March 1978 | Electrical Penetrations. Sheet 3 | |
ML20262J942 | 16 June 1981 | Electrical Penetrations. Sheet 1.Revision Date Illegible | |
ML20262J944 | 18 September 1979 | Vapor Container Primary Systems Elevations | |
ML20262J946 | 14 February 1962 | Main Coolant Piping, as-built.Sheet 1 | |
ML20262J948 | 14 February 1962 | Main Coolant Piping, as-built.Sheet 2 | |
ML20262J950 | 14 February 1962 | Main Coolant Piping, as-built.Sheet 3 | |
ML20262J951 | 14 February 1962 | Main Steam Piping, as-built.Sheet 1 | |
ML20262J954 | 14 February 1962 | Main Steam Piping, as-built.Sheet 2 | |
ML20262J955 | 17 July 1975 | Boiler Feed Pump - Discharge Piping. Sheet 1 | |
ML20262J957 | 17 July 1975 | Boiler Feed Pump - Discharge Piping. Sheet 2 | |
ML20262J960 | 17 July 1975 | Boiler Feed Pump - Discharge Piping. Sheet 3 | |
ML20262J961 | 30 August 1976 | Stm Generator Cont Blowdown Piping. Sheet 1 | |
ML20262J964 | 14 February 1962 | Safety Valve Piping - Main Coolant System, as-built.Sheet 1 | |
ML20262J965 | 22 February 1979 | Safety Valve Piping - Main Coolant System. Sheet 2 | |
ML20262J966 | 22 June 1961 | Shut Down Cooling Piping, as-built.Sheet 1 | |
ML20262J969 | 30 August 1976 | Charging & Bleed Piping - Vapor Container | |
ML20262J970 | 23 May 1979 | Charging Piping. Sheet 1 | |
ML20262J973 | 18 October 1977 | Drain Piping - Primary System. Sheet 1 | |
ML20262J974 | 13 February 1978 | Safety Injection Water Piping - Vapor Container, as-built |