Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CAC:L3331718 January 2018
CAC:MF3368
CAC:MF488720 April 2018
CAC:MF59019 August 2018
CAC:MF59109 August 2018
CAC:MF663821 June 2016
CAC:MF807525 June 2018
CAC:MF91418 May 2018
CAC:MG022026 February 2018
ENS 45100Part 21 Report - Air Circuit Breaker Deficiency
ENS 52310Westinghouse Life Line D Type Lac Induction Motor Failure
ENS 52378Part 21 Notification - Control Rod Guide Card Excessive Wear
ENS 53023Part 21 Notification - Hpsi Motor Lead Insulation Gouged
ENS 53422Part 21 - Wear of Thermal Sleeve in Westinghouse Control Rod Drive Mechanisms
ENS 54440Part 21 Report - Fractured and Dislocated Control Rod Drive Mechanism Thermal Sleeve
EPID:L-2014-TOP-000206/11-12/2018, Closed Audit List of AWCAP-16747-P
EPID:L-2014-TOP-0003Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3
EPID:L-2016-TOP-0015Final SER (Non-Prop) - TR-0116-21012, Revision 1, NuScale Power Critical Heat Flux Correlations.
EPID:L-2017-RNW-0016Westinghouse License Renewal
EPID:L-2017-TOP-0035
EPID:L-2017-TOP-0059
EPID:L-2017-TOP-0064Request for Additional Information for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement
EPID:L-2018-LLM-0001
EPID:L-2018-LRO-0002
EPID:L-2018-LRO-0011Summary of Westinghouse Electric Company 2018 Fuel Performance Update Meeting
EPID:L-2018-TOP-0003
EPID:L-2018-TOP-0012Summary of the Pre-Submittal Closed Meeting for the Westinghouse Electric Company Future Submittal of WNG-2 Topical Report
EPID:L-2018-TOP-0020
EPID:L-2018-TOP-0026Summary of Closed Meeting Meeting Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp)
EPID:L-2018-TOP-0028Transmittal of Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 003
EPID:L-2018-TOP-0032Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies
EPID:L-2018-TOP-0033Attachment - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp)
EPID:L-2018-TOP-0043
EPID:L-2019-DFA-0004
EPID:L-2019-DFA-0007
EPID:L-2019-LNS-0009
EPID:L-2019-SPR-0006Approval of Westinghouse PSP Rev. 47
EPID:L-2019-TOP-0012
EPID:L-2019-TOP-0014Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms
EPID:L-2019-TOP-0015List of Attendees for the June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Clad
EPID:L-2019-TOP-0026
EPID:L-2019-TOP-0033
EPID:L-2019-TOP-0042Oct 24, 2019 Topical Report Transformation Workshop
EPID:L-2019-TOP-0047
EPID:L-2020-EPR-0000Approval of WEC Request for a Temporary Change to the Site Emergency Plan
EPID:L-2020-LLL-0009Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility
EPID:L-2020-LRO-0046
EPID:L-2020-LRO-0077
EPID:L-2020-TOP-0002
EPID:L-2020-TOP-0003