Semantic search
Jump to navigation
Jump to search
Start date | Status | Title | Topic | |
---|---|---|---|---|
CAC:MF0799 | 5 August 2016 | Approved Closed | ||
CAC:MF3301 | 27 May 2015 | Approved Closed | ||
CAC:MF3302 | 27 May 2015 | Approved Closed | ||
CAC:MF3726 | 7 November 2016 | Approved Closed | ||
CAC:MF5879 | 19 March 2015 | Approved Closed | ||
CAC:MF6054 | 1 April 2015 | Approved Closed | ||
CAC:MF7212 | 22 December 2015 | Approved Closed | ||
CAC:MF7472 | 22 January 2016 | Approved Closed | ||
CAC:MF7771 | 27 June 2016 | Approved Closed | ||
CAC:MF8066 | 13 September 2016 | Approved Closed | ||
CAC:MF8121 | 20 October 2016 | Approved Closed | ||
CAC:MF8330 | 31 August 2016 | Approved Closed | ||
CAC:MF8332 | 26 June 2017 | Approved Closed | ||
CAC:MF8333 | 26 June 2017 | Approved Closed | ||
CAC:MF8334 | 3 February 2017 | Approved Closed | ||
CAC:MF8335 | 3 February 2017 | Approved Closed | ||
CAC:MF8448 | 27 October 2016 | Approved Closed | ||
CAC:MF8531 | 1 December 2016 | Approved Closed | ||
CAC:MF8854 | 16 November 2016 | Approved Closed | ||
CAC:MF9272 | 12 December 2017 | Approved Closed | ||
CAC:MF9580 | 1 March 2018 | Approved Closed | ||
CAC:MF9582 | 1 March 2018 | Approved Closed | ||
CAC:MF9714 | 18 May 2017 | Withdrawn Closed | ||
CAC:MF9887 | 30 June 2017 | Approved Closed | ||
CAC:MG0086 | 8 August 2017 | Approved Closed | ||
CAC:MG0133 | 11 August 2017 | Approved Closed | ||
EPID:L-2017-LLR-0130 | 25 October 2017 | Approved Closed | 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) | |
EPID:L-2017-LLR-0131 | 21 April 2017 | Approved Closed | Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule | |
EPID:L-2017-LLR-0137 | 6 October 2017 | Approved Closed | Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule | |
EPID:L-2017-LLR-0138 | 13 November 2017 | Approved Closed | Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-4 Examination Requirements (Request No. 2-TYP-4-RV-02) | |
EPID:L-2017-LRO-0083 | 1 April 2019 | Approved Closed | ||
EPID:L-2018-LLA-0075 | 28 March 2018 | Approved Closed | ||
EPID:L-2018-LLE-0016 | 4 June 2019 | Approved Closed | ||
EPID:L-2018-LLE-0025 | 18 December 2018 | Approved Closed | Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H | |
EPID:L-2018-LLR-0026 | 3 April 2018 | Approved Closed | ||
EPID:L-2018-LRO-0105 | 13 November 2018 | Approved Closed | Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report | |
EPID:L-2019-LLA-0155 | 18 December 2019 | Approved Closed | November 2019 NPDES Discharge Monitoring Report (DMR) | |
EPID:L-2019-LLA-0223 | 20 October 2019 | Approved Closed | License Amendment Request to Modify Technical Specifications 3.4.16, RCS Specific Activity, 3.7.13 Secondary Specific Activity, 5.5.7, Ventilation Filter Testing Program (Vftp), and 5.5.14, Control Room Envelope. | |
EPID:L-2019-LLL-0028 | 30 April 2019 | Approved Closed | Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for the Davis-Besse Nuclear Power Station | |
EPID:L-2019-LLM-0000 | 15 March 2019 | Approved Closed | Stations - Irradiated Fuel Management Plans | |
EPID:L-2019-LLR-0013 | 20 February 2019 | Approved Closed | Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0) | |
EPID:L-2019-LLR-0082 | 27 August 2019 | Approved Closed | Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | |
EPID:L-2019-LLR-0083 | 23 August 2019 | Approved Closed | Unit 1, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | |
EPID:L-2019-LRO-0000 | 28 March 2019 | Approved Closed | Day Steam Generator Tube Inspection Report | |
EPID:L-2020-LLA-0025 | 11 February 2020 | Approved Closed | License Amendment Request - Proposed Change to Technical Specifications Sections 1.1. Definitions, and 5.0 Administrative Controls. for Permanently Defueled Condition | |
EPID:L-2020-LLA-0071 | 16 April 2020 | Approved Closed | ||
EPID:L-2020-LLA-0127 | 29 June 2020 | Approved Closed | TSTF-563 | |
EPID:L-2020-LLA-0138 | 23 June 2020 | Approved Closed | License Amendment Request to Correct Non-conservative Technical Specifications 3.2 .1, Heat Flux Hot Channel Factor Fa(Z) and 5.6.3, Core Operating Limits Report (COLR) | |
EPID:L-2020-LLA-0140 | 22 May 2020 | Approved Closed | License Amendment Request to Revise Technical Specification Requirements Related to Inspection Method and Service Life for Alloy 800 Steam Generator Tubesheet Sleeves | |
EPID:L-2020-LLA-0154 | 10 July 2020 | Approved Closed | TSTF-567 |