Semantic search

Jump to navigation Jump to search
 Start dateStatusTitleTopic
CAC:MF07995 August 2016Approved
Closed
CAC:MF330127 May 2015Approved
Closed
CAC:MF330227 May 2015Approved
Closed
CAC:MF37267 November 2016Approved
Closed
CAC:MF587919 March 2015Approved
Closed
CAC:MF60541 April 2015Approved
Closed
CAC:MF721222 December 2015Approved
Closed
CAC:MF747222 January 2016Approved
Closed
CAC:MF777127 June 2016Approved
Closed
CAC:MF806613 September 2016Approved
Closed
CAC:MF812120 October 2016Approved
Closed
CAC:MF833031 August 2016Approved
Closed
CAC:MF833226 June 2017Approved
Closed
CAC:MF833326 June 2017Approved
Closed
CAC:MF83343 February 2017Approved
Closed
CAC:MF83353 February 2017Approved
Closed
CAC:MF844827 October 2016Approved
Closed
CAC:MF85311 December 2016Approved
Closed
CAC:MF885416 November 2016Approved
Closed
CAC:MF927212 December 2017Approved
Closed
CAC:MF95801 March 2018Approved
Closed
CAC:MF95821 March 2018Approved
Closed
CAC:MF971418 May 2017Withdrawn
Closed
CAC:MF988730 June 2017Approved
Closed
CAC:MG00868 August 2017Approved
Closed
CAC:MG013311 August 2017Approved
Closed
EPID:L-2017-LLR-013025 October 2017Approved
Closed
10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2)
EPID:L-2017-LLR-013121 April 2017Approved
Closed
Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule
EPID:L-2017-LLR-01376 October 2017Approved
Closed
Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule
EPID:L-2017-LLR-013813 November 2017Approved
Closed
Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-4 Examination Requirements (Request No. 2-TYP-4-RV-02)
EPID:L-2017-LRO-00831 April 2019Approved
Closed
EPID:L-2018-LLA-007528 March 2018Approved
Closed
EPID:L-2018-LLE-00164 June 2019Approved
Closed
EPID:L-2018-LLE-002518 December 2018Approved
Closed
Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H
EPID:L-2018-LLR-00263 April 2018Approved
Closed
EPID:L-2018-LRO-010513 November 2018Approved
Closed
Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report
EPID:L-2019-LLA-015518 December 2019Approved
Closed
November 2019 NPDES Discharge Monitoring Report (DMR)
EPID:L-2019-LLA-022320 October 2019Approved
Closed
License Amendment Request to Modify Technical Specifications 3.4.16, RCS Specific Activity, 3.7.13 Secondary Specific Activity, 5.5.7, Ventilation Filter Testing Program (Vftp), and 5.5.14, Control Room Envelope.
EPID:L-2019-LLL-002830 April 2019Approved
Closed
Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for the Davis-Besse Nuclear Power Station
EPID:L-2019-LLM-000015 March 2019Approved
Closed
Stations - Irradiated Fuel Management Plans
EPID:L-2019-LLR-001320 February 2019Approved
Closed
Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0)
EPID:L-2019-LLR-008227 August 2019Approved
Closed
Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements
EPID:L-2019-LLR-008323 August 2019Approved
Closed
Unit 1, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements
EPID:L-2019-LRO-000028 March 2019Approved
Closed
Day Steam Generator Tube Inspection Report
EPID:L-2020-LLA-002511 February 2020Approved
Closed
License Amendment Request - Proposed Change to Technical Specifications Sections 1.1. Definitions, and 5.0 Administrative Controls. for Permanently Defueled Condition
EPID:L-2020-LLA-007116 April 2020Approved
Closed
EPID:L-2020-LLA-012729 June 2020Approved
Closed
TSTF-563
EPID:L-2020-LLA-013823 June 2020Approved
Closed
License Amendment Request to Correct Non-conservative Technical Specifications 3.2 .1, Heat Flux Hot Channel Factor Fa(Z) and 5.6.3, Core Operating Limits Report (COLR)
EPID:L-2020-LLA-014022 May 2020Approved
Closed
License Amendment Request to Revise Technical Specification Requirements Related to Inspection Method and Service Life for Alloy 800 Steam Generator Tubesheet Sleeves
EPID:L-2020-LLA-015410 July 2020Approved
Closed
TSTF-567