Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20134J108 | 13 May 2020 | US Dept of Interior Geological Survey (USGS) Wallick J | U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01 | Request |
ML20161A127 | 4 June 2020 | US Dept of Interior Geological Survey (USGS) Wallick J | U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Revision 01 | Request |
ML20176A465 | 25 June 2020 | Geoffrey Wertz NRC/NRR/DANU/UNPL | U.S. Geological Survey - Supplemental Information Needed for Acceptance of the Application for a License Amendment Exception to 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power. | Acceptance Review |
ML20177A610 | 25 June 2020 | US Dept of Interior Geological Survey (USGS) Wallick J | U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Supplemental Information Provided in Response to ML20176A465 | Supplement |
ML20183A162 | 2 July 2020 | Geoffrey Wertz NRC/NRR/DANU/UNPL | U.S. Geological Survey - Acceptance of the Application for a License Amendment Exception to TS 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power Level Not Greater than 5 Kilowatts | Acceptance Review |
ML20233A996 | 9 October 2020 | Geoffrey Wertz NRC/NRR/DANU/UNPL | Us Geological Survey - Issuance of Amendment No. 13 to Renewed Facility Operating License No. R-113 to Amend Technical Specifications 3.1.3 and 4.1 for the Us Geological Survey Triga Research Reactor | Approval |
ML21011A048 | 1 February 2021 | Siva Lingam Plant Licensing Branch IV | Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | Approval |