ML15205A179
| ML15205A179 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 07/13/2012 |
| From: | Shea J W Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML15205A179 (3) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402July 13, 201210 CFR 50, Appendix E, Section VATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3Facility Operating License Nos. DPR-33, DPR-52, and DPR-68NRC Docket Nos. 50-259, 50-260, and 50-296Sequoyah Nuclear Plant, Units 1 and 2Facility Operating License Nos. DPR-77 and DPR-79NRC Docket Nos. 50-327 and 50-328Watts Bar Nuclear Plant, Unit 1Facility Operating License No. NPF-90NRC Docket No. 50-390
Subject:
Central Emergency Control Center -Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, thissubmittal provides the revised Central Emergency Control Center (CECC) Emergency PlanImplementing Procedure (EPIP) as listed below.EPIPRevisionTitleCECC EPIP-1CECC EPIP-2CECC EPIP-3544041Central Emergency Control Center(CECC) Operations Operations Duty Specialist Procedure for Notification of UnusualEventOperations Duty Specialist Procedure for AlertEffective Date06/15/2012 06/15/2012 06/15/2012 hNL~L5Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2July 13, 2012EPIP Revision Title Effective DateCECC EPIP-4 42 Operations Duty Specialist 06/15/2012 Procedure for Site Area Emergency CECC EPIP-5 46 Operations Duty Specialist 06/15/2012 Procedure for General Emergency CECC EPIP-6 34 CECC Plant Assessment Staff 06/15/2012 Procedure for Alert, Site AreaEmergency, and General Emergency CECC EPIP-7 33 CECC Radiological Assessment 06/15/2012 Staff Procedure for Alert, Site AreaEmergency, and General Emergency Enclosure 1 provides a description of the changes and a summary of the analysis performed that concluded the changes do not affect the outcome,
- results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosures 2 through 8provide a copy of the revised EPIPs.There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Terry Cribbe at (423) 751-3850.
Respectfully, J. .Shea-Vice President, Nuclear Licensing
Enclosures:
- 1. Summary of Changes and Analysis2. CECC EPIP-1, Central Emergency Control Center (CECC) Operations, Revision543. CECC EPIP-2, Operations Duty Specialist Procedure for Notification of UnusualEvent, Revision 404. CECC EPIP-3, Operations Duty Specialist Procedure for Alert, Revision 415. CECC EPIP-4, Operations Duty Specialist Procedure for Site Area Emergency, Revision 426. CECC EPIP-5, Operations Duty Specialist Procedure for General Emergency, Revision 467. CECC EPIP-6, CECC Plant Assessment Staff Procedure for Alert, Site AreaEmergency, and General Emergency, Revision 348. CECC EPIP-7, CECC Radiological Assessment Staff Procedure for Alert, SiteArea Emergency, and General Emergency, Revision 33cc: See Page 3 U.S. Nuclear Regulatory Commission Page 3July 13, 2012cc (Enclosures):
NRC Regional Administrator
-Region IINRC Senior Resident Inspector
-Browns Ferry Nuclear PlantNRC Senior Resident Inspector
-Sequoyah Nuclear PlantNRC Senior Resident Inspector
-Watts Bar Nuclear Plant