ML17229A090

From kanterella
Revision as of 14:49, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
ML17229A090
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/24/1996
From: STALL J A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17229A091 List:
References
L-96-273, NUDOCS 9610280062
Download: ML17229A090 (5)


Text

CATEGORY1REGUL'ATINFORMATION DISTRIBUTIOtSTEM (RIDE)ACCESSION NBR:961,0280062 DOC.DATE:

96/10/24NOTARIZED:

NODOCKETgFACIL:50-335 St.LuciePlant,Unit1,FloridaPower&LightCo.05000335AUTH.NAMEAUTHORAFFILIATION STALL,"J.A.

FloridaPower6LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)

SUBJECT:

Forwardsencldemonstrating thatallsignificant parameters ofDraftRegGuide,Steame Generator TubeIntegrity,met for14monthsofoperation, whiletoplevelcriterion remainslessthan0.05for15monthperiodofoperation.

DISTRIBUTION CODE:AOOIDCOPIESRECEIVED:LTR JENCLISIZE:+ZTITLE:ORSubmittal:

GeneralDistribution NOTES:RECIPIENT IDCODE/NAME PD2-3LA.WIENSFL.

COPIESLTTRENCL1111RECIPIENT IDCODE/NAME PD2-3PDCOPIESLTTRENCL11RINTERNAL:

ACRSNRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL:

NOAC1~111111111NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3NRCPDR1111111011D0UNNOTETOALLNRIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR13ENCL12 FloridaPower8tLightCompany,P.O.Box128,FortPierce,FL34854-0128 October24,1996L-96-27310CFR50.4U.S.Ihluclear Regulatory Commission Attn:DocumentControlDeskWashington, D.C.20555RE:St.LucieUnit1DocketNo.50-335SteamGenerator RunTimeAnalsisforCcle14DuringaJuly3,1996,meetingwiththeNRC,FloridaPowerandLightCompany(FPL)committed toprovidetheresultsoftheSt.LucieUnit1steamgenerator runtimeanalysistotheNRCwithin90daysofthestartupfromthe1996refueling outage(SL1-14).

FPLplanstooperatetheUnit1steamgenerators forfifteen(15)monthsthroughOctober23,1997.Theruntimeanalysisisaphysically basedanalysisusingtheguidancecontained inDraftRegulatory Guide(RG)1.121,GenericLetter95-05,andtheDraftRegulatory Guide,SteamGenerator TubeIntegrity.

Thefifteen(15)monthoperating cyclerepresents aseven(7)monthreduction intheoriginally scheduled cycleoftwenty-two (22)months.Thisrevisedoperating cyclelengthwillpermitthesafeoperation ofthesteamgenerators untiltheearliestdatefortheinstallation ofthereplacement steamgenerators.

Enclosure 1istheSt.LucieUnit1SteamGenerator RunTimeAnalysisforCycle14.Thisruntimeanalysisincludestheresponses totheNRCrequestsforadditional information datedJuly26,1996.Enclosures 2,3,and4areFPLcontractor reportswhicharereferenced inthesteamgenerator runtimeanalysis.

Enclosure 2isAPTECHEngineering ServicesReport,AES96052749-1-1, datedOctober1996,AnalysisofODSCC/IGA atTubesheet andTubeSupportLocations atSt.LucieUnitl.Enclosure 3isScientific Applications International Corporation (SAIC)Report,SAIC05-5049-05-6734-500, datedSeptember 1996,SteamGenerator Degradation SpecificManagement (SGDSM)LeakageLimitCalculation forSt.LucieUnit1.Enclosure 4isABBCombustion Engineering Report,00000-OSW-16 Revision0,In-situPressureTestResultsforSt.LucieUnit1Spring1996Outage.Theenclosures demonstrate thatallofthesignificant parameters-of theDraftRegulatory Guide,SteamGenerator TubeIntegrity, havebeenmetforfourteen(14)monthsofoperation, whilethetoplevelcriterion (probability ofburst(POB)atmainsteamlinebreakconditions) remainslessthan0.05forthefifteen(15)monthperiodofoperation.

Aprobabilistic safetyassessment (PSA)demonstrates thatoperation fortheadditional monthdoesnotincreasethecoredamagefrequency (CDF)intothesafetysignificant category.

Theinclusion oftheEPRIprimarytosecondary leakguidelines inplantoperating procedures andincreased trainingofthelicensedoperators, asdocumented intheenclosures, providesFPL'scommitment torespondtopossibletubeleakevents.Anadditional benchmark oftheplannedcyclelengthisprovidedbytheendofCycle13in-situpressuretesting.Thistestingdemonstrated thatsteamgenerator tubeswithrepresentative worstcasedefectsmettherequirements ofDraftRG1.121r~R()gpf'ter13.9effective fullpowermonths(EFPM)ofoperation.

r96i0280062 96i024PDRprrADGCK

05000335, O'""'DR

~yeslJ1 S;.LucieUnit1DocketNo,50-335L-96-273Page2Insummary,FPLconsiders thatsafeoperation oftheSt.LucieUnit1steamgenerators forfifteen(15)monthsthroughOctober23,1997,issupported bytheenclosedruntimeanalysis, theendofCycle13repairsandin-situpressuretesting,theincorporation ofmorerestrictive operational tubeleakagelimits,andtheenhancedoperatortraining.

Asdiscussed attheJuly3,1996meeting,FPLispreparedtomeetwiththeNRCtodiscusstheresultsoftheanalysesoncetheNRCStaffhashadanopportunity toreviewthismaterial.

VetyoursJ.A.StallVicePresident St.LuciePlantJAS/GRMEnclosures (4)cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant

~i4~.srr