Responds to Violations Noted in Insp Repts 50-315/94-06 & 50-316/94-06.Corrective Actions:Procedure 12 Thp 6010 RPP.606 Revised to Include WD-490 in Valve Lineup
ML17331B440
Person / Time
Site: Cook  
Issue date: 05/25/1994
From: FITZPATRICK E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: MARTIN J B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1212B, NUDOCS 9406230229
Download: ML17331B440 (8)


See also: IR 05000315/1994006

Text

ACCELERATED

DOCUMENTDISTRIBUTION

SYSTEMSUBJECT:Respondstoviolations

notedininsprepts50-315/94-06

&50-316/94-06.Corrective

actions:Procedure

12THP6010RPP.606revisedtoincludeWD-490invalvelineup.DISTRIBUTION

CODE:IE06DCOPIESRECEIVED:LTR

ENCLSIZE:TITLE:Environ&Radiological

(50DKT)-Insp

Rept/Notice

ofViolation

ResponsIDNOTES:REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM(RIDS)ACCESSION

NBR:9406230229

DOC.DATE:

94/05/25NOTARIZED:

YESDOCKET¹,'ijFACIL:50-315

DonaldC.CookNuclearPowerPlant,Unit1,IndianaM0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTH.NAMEAUTHORAFFILIATION

FITZPATRICK,E.

IndianaMichiganPowerCo.(formerly

Indiana&MichiganEleRRECIP.NAME

RECIPIENT

AFFILIATION

MARTINFJ.B.

DocumentControlBranch(Document

ControlDesk)RECIPIENT

IDCODE/NAME

PD3-1PDINTERNAL:

AEOD/DSPNMSS/SGTB

4E4NRR/PMAS/ILRBl2

NUDOCS-ABSTRACT

OGC/HDS2RESRGN3FILEOlTERNAL:NRCPDRCOPIESLTTRENCL11111111111111111RECIPIENT

IDCODE/NAME

HICKMAN,J

AEOD/TTCNRR/DREP/PRPB10

NRR/PMAS/IRCB-E

OEDIRQFILE02RGNDRSS/RPBRGN4/FIPS

NSICCOPIESLTTRENCL111122111111111111DDDDNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2065)

TOELIMINATE

YOURNAMEFROMDISTRIBUTION

LISTSFORDOCUMENTS

YOUDON'TNEEDlDTOTALNUMBEROFCOPIESREQUIRED:

LTTR19ENCL19

IndianaMichiganPowerCompanyP.O.Box1663ICoiumbus,

OH43246lNDIANANECHlGANPOWMAEP:NRC:1212B-

10CFR2.201DonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74NRCINSPECTION

REPORTSNO.50-315/94006

(DRSS)AND50-316/94006

(DRSS)REPLYTONOTICEOFVIOLATION

U.S.NuclearRegulatory

Commission

DocumentControlDeskWashington,

D.C.20555Attn:Mr.J.B.MartinMay25,1994DearMr.Martin:ThisletterisinresponsetoaUSNRCletterdatedApril29,1994,thatforwarded

aNoticeofViolation

(NOV)toIndianaMichiganPowerCompany.TheNOVcontained

oneviolation

whichwasself-identified

bythelicenseeandnotedduringa-routineradiation

protection

inspection

conducted

byMr.C.R.CoxfromMarch28throughApril1,1994.Theviolation

isassociated

withtheproceduralized

activities

thatledtothespentresinspillinthe587'rumming

roomonMarch19,1994.Inresponsetotheevent,promptactionwastakentosuspendallresintransferactivities.

Corrective

actions,intheformofprocedure

revisions,

wereinstituted

topreventrecurrence

priortoresumption

ofsuchactivities.

Ourreplyto'thenoticeofviolation

isprovidedintheattachment

tothisletter.Thisletterissubmitted

pursuantto10CFR50'4(f)and,assuch,anoathstatement

isattached.

Sincerely,

pp~pcWE.E.Fitzpatrick

VicePresident

dr9'406230229

9'40525.PDRADOCK050003159PDR

STATEOFOHIO)COUNTYOFFRANKLIN)

E.E.Fitzpatrick,

beingdulysworn,deposesandsaysthatheistheVicePresident

oflicenseeIndianaMichiganPowerCompany,thathehasreadtheforgoingresponsetoNRCINSPECTION

REPORTSNO.50-315/94006

(DRSS)AND50-316/94006

(DRSS),REPLYTONOTICEOFVIOLATION

andknowsthecontentsthereof;andthatsaidcontentsaretruetothebestofhisknowledge

andbelief.Subscribed

andsworntobeforemethis~~4dayof19NOTARPUBLIC-RlTAD.HE'LLNOTARYPUDuC.STATEOPOHt."

Mr.J.B.Martin2AEP:NRC:1212B

Attachments

CC:A.A.BlindG.CharnoffNFEMSectionChiefNRCResidentInspector

-Bridgman,

MINRCResidentInspector

-BigRockPointNuclearPlantJ.R.PadgettW.T.Russell,NRC-Washington,

D.C.

ATTACHMENT

TOAEP:NRC:1212B

REPLYTONOTICEOFVIOLATION

ATTACHMENT

TOAEP:NRC:1212B

Page1Background

Aroutineradiation

protection

inspection

wasconducted

byMr.C.R.CoxfromMarch28throughApril1,1994.Duringthisinspection,

oneitemwasfoundtobeinviolation.

Theviolation

wasidentified

asinappropriateness

ofprocedures

withregardtotheactivities

thatledtothespentresinspillinthe587drummingroomonMarch19,1994.Thisviolation

wassetforthinalettercontaining

thenoticeofviolation,

datedApril29,1994,fromMr.JohnA.Grobe,ActingChief,ReactorsSupportProgramsBranch.TheletterwasreceivedMay10,1994.Ourresponsetothenoticeofviolation

iscontained

withinthisdocument.

NRCViolation

I"10CFR50,AppendixB,Criterion

V,"Instructions,

Procedures,

andDrawings,"

requiresthatactivities

affecting

qualitybeprescribed

byaprocedure

ofatypeappropriate

tothecircumstances

andshallbeaccomplished

inaccordance

withtheseprocedures.

Contrarytotheabove:OnMarch18,1994,Procedure

12THP6010RPP.606,"Operation

oftheRadi.oactive

WasteWaterDemineralizer

System(RWDS),"wasinappropriate

tothecircumstances

inthatthevalvelineupfailedtoidentifyavalverequiredtobeopenedfortheevolution

tobecompleted

successfully.

2.OnMarch19,1994,Procedure

02OHP4021.007.002,

"ReactorCoolantDemineralizer

ResinSluicingandReplacement,"

wasinappropriate

tothecircumstances

inthattheprocedure

failedtoidentifyalternative

flowpathsandthevalveswhosepositions

neededtobeverifiedtopreventthosealternative

flowpaths.ThisisaSeverityLevelIVviolation

(Supplement

I)."

ATTACHMENT

TOAEP,:NRC:1212B

Page2ResponsetoViolation

Admission

orDenialoftheAlleedViolation

IndianaMichiganPowerCompanyadmitstotheviolation

ascitedintheNRCnoticeofviolation.

2.ReasonsfortheViolation

Thevalvelineupforprocedure

12THP6010RPP.606,"Operation

oftheRadioactive

WasteWaterDemineralizer

System(RWDS),"failedtoidentifyWD-490duetotheprocedure

author'smisinterpretation

ofvalveinformation

whentransitioning

fromoneflowprinttoanother.Theauthorincorrectly

assumedthatWD-498wasidentified

ontwoprintswheninfactWD-498wasononeprintandWD-490wasontheother.Subsequent

procedure

reviewsperformed

priortotheprocedure

approvalfailedtoidentifytheoriginalerror.Procedure

02OHP4021.007.002,

"ReactorCoolantDemineralizer

ResinSluicingandReplacement,"

failedtoidentifyalternative

flowpaths""andthevalveswhosepositions

neededtobeverifiedclosedtopreventthosepathsfrombeingused.Thiswasduetothebasicassumption

thatthesubjectvalvesarenormallymaintained

intheclosedpositionand,therefore,

acheckwasnotnecessary.

Corrective

ActionsTakenandResultsAchievedOnMarch18,1994,procedure

12THP6010RPP.606,"Operation

oftheRadioactive

WasteWaterDemineralizer

System(RWDS),"wasrevisedtoincludeWD-490inthevalvelineup.OnMarch25,1994,procedure

02OHP4021.007.002,

"ReactorCoolantDemineralizer

ResinSluicingandReplacement,"

wasrevised-toincludeverification

ofthesubjectalternate

flowpathsandtheassociated

valveswhichpositions

neededtobeverified.

Corrective

ActionsTakentoAvoidFurtherViolations

Theprocedure

usedbytheradiation

protection

department

forprocedure

preparation,

reviewandmaintenance

willberevisedtoenhancereviewsperformed

toensureprocedure

accuracy.

Thisrevisionwillbecompleted

priortoJuly1,1994.

ATTACHMENT

TOAEP:NRC:1212B

Page3Inthecoverlettertothesubjectnoticeofviolation/inspection

'eport,itwasrequested

thatourresponseincludeareviewofsimilarevolutions

that'requirecoordination

betweendifferent

groupsandthestepstakentoimprovethecoordination

andcommunications

betweensuchgroups.Reviewandassessment

ofcoordination

andcommunication

betweendifferent

groupsisanintegralpartofourcorrective

actionprogram.Previousassessment

leadtotheinitiation

ofacomprehensive

improvement

planwithintheChemistry

Department.

Similarly,

aselfassessment

ofrecenteventsrelatedtocoordination

andcommunication

withintheOperations

Department

hasresultedintheinitiation

ofsignificant

changeswithinthisdepartment.

ThelatestanalysisofourCorrective

ActionProgramDataBaserevealedthatcommunications

remainachallenge.

Thisinformation

hasbeenprovidedtotheappropriate

management

personnel.

Wewillcontinuetomonitorperformance

intheseareasandprovidefeedbackrelativetotheeffectiveness

ofperformance

improvement

initiatives.

TeamworkandCommunication

arecriticaltothesuccessofanyoperation

andthe,importance

ofeachhasconsistently

beenemphasized

duringStateofthe"Plant

Sessionsconducted

bytheVicePresident-Plant

Managerandattendedbyplantandcontractpersonnel.

Inaddition,

theAEPNuclearOrganization

hasinitiated

anintegrated

TeamBuildingprocess.Thisintegrated

TeamBuildingprocesswasinitiated

bySeniorManagement

andisdesignedtoenhanceteamwork,

coordination

andcommunication

throughout

thewholeorganization.

Also,theradiation

protection

department

willreviewsimilarprocedural

evolutions

thatrequirecoordination

betweendifferent

groupsandwilldelineate

withintheseprocedures

individual

responsibilities

forcommandandcontroloftheactivityfrombothanintradepartment

andinterdepartment

coordination

perspective.

Thisreviewwillbecompleted

priortoJuly1,1994.Procedure

changesrequiredasaresultofthisreviewwillbecompleted

priortoMay1,1995.Inaddition,

theoperations

department

willreviewthiseventwiththeoperations

procedure

groupandwilldetermine

ifchangesarenecessary

tothecurrentprocedure

development

process.Thisreviewwillbecompleted

priortoJuly1,1994.Processchangesrequiredasaresultofthisreviewwi13.becompleted

priortoMay1,1995.DateWhenFullComlieneeVillBeAchievedFullcompliance

wasachievedonMarch25,1994,withtherevisiontoProcedure

02OHP4021.007.002,

"ReactorCoolantDemineralizer

Resin'Sluicing

andReplacement".