'.ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
~ '
DOC.DATE: ~
REGULATORY'NFORMATION DISTRIBUTION SYSTEM (RIDS)
.ACCESSION NBR:9104160234 NOTARIZED: NO FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana & 05000315 AUTH. NAME GILLETT,W.T.
BLIND,A.A.
AUTHOR AFFILIATION Indiana Michigan Power Co. (formerly Indiana & Michigan Eke Indiana Michigan Power Co. (formerly Indiana & Michigan Ele DOCKET, 4 RECIP.NAME RECIPIENT AFFILIATION R I
SUBJECT:
Mont operating rept for Mar 1991 for DC Cook Unit 1.W/ l 1 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly. Operating Report (per Tech Specs) l ENCL Q SIZE:
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 3 3 PD3-1 PD 1 1 D COLBURN,T. 1 1 D
INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 I N PEB10 1 1 NRR/DOEA/OEAB 1 1 8 BC~LE 01 1 1 RGN3 1 1 EXTERNAL: EG &G BRYCE, J. H 1 1 NRC PDR NSIC 1 1 D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIM!NATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
V ig 4
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 R
April 3, 1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1991 is submitted.
Respectfully, h 96 A.A. Blind Plant Manager Attachment c: NRC Region D.R. Hahn III EPRI Nuclear Safety Analysis Center R.C. Callen S.L. Hall J.G. Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.
E.E. Fitzpatrick J.F. Kurgan J.J. Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart J.L. Leichner J.A. Isom W.T. Gillett E.A. Smarrella J.C. Krieger B.A. Svensson f QG Q ~C. D.F. Krause Schimmel R 'DR 9'i04i60234 9i033i PDR ADOCK 05000315
N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 01-Apr-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1
- 2. Reporting Period MAR.91 notes
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1030
- 6. Maximum Dependable Capacity (GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1020
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted.
- 10. Reasons For Restrictions. If If Any Any:
(Net MWe)
This Mo. Yr. to Date ll. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical 744.0 2160.0 Cumm.
142416.0 744.0 1634.4 105021.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 744.0 1534.8 103163 '
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Therm. Energy Gen. (MWH) 2404498 4719399 300149047
- 17. Gross Elect. Energy Gen. (MWH) 784830 1526800 97658030
- 18. Net Elect. Energy Gen. (MWH) 757536 1470894 93904367
- 19. Unit Service Factor 100.0 71 1
~ 73 '
- 20. Unit Availability Factor 100 ' 71 1
~ 73 '
- 21. Unit Capacity Factor (MDC Net) 99.8 66.8 65.6
- 22. Unit Capacity Factor (DER Net) 98.9 66.1 63.7
- 23. Unit Forced Outage Rate 0.0 0.0 7.0
- 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO. 50-315 UNIT ONE DATE 01-Apr-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 MONTH MAR. 91 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 1011 17 1016 2 994 18 1022 3 1019 19 1019 4 1019 20 1021 5 1018 21 1019 6 1020 22 1016 7 1022 23 1022 8 1017 24 1014 9 1020 25 1021 10 1024 26 1021 11 1018 27 1023 12 1012 28 1022 13 1013 29 1021 14 1020 30 1024 15 1017 31 1022 16 1015
DOCKET NO: 50-315 UNIT SHUTDOWNS AND POWER REIXJCZXONS UNIT NAME D.C. COOK UNIT '1 IRTE: April 3, 1991 REPORT KRIS: Ku~ 1991 K5PLETED BY: E.C. Schimme1 TEZ2KEONE (616) 465-5901 MEBKD OF SHUTTING LICENSEE EURATION DGNN EVEÃZ SYSTBf CXMKRKÃZ CAUSE AND CORRECZIVE ACZXCIN TO NO. DATE TYPE1 HOURS REASGN2 REAczaH REPORT NO. CODE CODE PREVEÃZ REXX3HRENCE None There were no unit shutdowns or significant power reductions fram maximum power level of 100% during the month.
1 2 3 4 5 F: Forced Reason: Method Exhibit G - Instructions Exhibit I: Same Source S: Scheduled A: Equipment Failure (Explain) 1. Manual for preparation of data 2: Manual Scmn entxy sheets for Licensee C: Refueling 3: Auhzoatic Scram Event Report (IZR) File D: RecpQatory Restriction 4: Other (Explain) (NUEKG 0161)
E: Operator Training and Lice'amination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
DOCKET 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: E.C. Schimmel TELEPHONE: (616) 465-5901 DATE April 3, 1991 PAGE 1 of 1 MONTHLY OPERATING ACTIVITIES March 1991 HIGHLIGHTS The unit entered the reporting period at 100: RTP and exited the reporting period at 100% Rated Thermal Power, with no significant load changes.
Gross electrical generation for the month of March was 784830 MWH.
DETAILS There were no significant operational events during the month of March.
DOCKET NO. 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: E.C. Schimmel TELEPHONE: (616) 465-5901 DATE April 3, 1991 PAGE: 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE - March 1991 There were no major safety-related maintenance items during the month of March.