ML20003E842
| ML20003E842 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/14/1981 |
| From: | Lafleur J ATOMIC INDUSTRIAL FORUM |
| To: | Lafleur J NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP) |
| References | |
| NUDOCS 8104170356 | |
| Download: ML20003E842 (1) | |
Text
.
pt 191 b e s
!R u N RC 4HDA f% %d.% l s Jg f".f WU INF0 MASTER 1-0182201104-109 04/14/81 '.}1, 3!
TWX WU ISCS MLTN D 90 0006 COLLECT (4,0320010100 TFX 7108249602) S j\
T4x 7103240415 NdC BHDA M ATTN: JOSEPH LAFLEUR APPROXMATELY 160,000 GALLONS OF SLIGHTL Y CON TAMIN A TED WATER ACCIDENTALLY DAAINED FROM A CONUENSA TE PEACH ELECTRIC'S ST0dAGE TANA IN IN THE CON TAINMENT. STRUCrudE AT PHILADELPHI A BO TTOM THREE REACT]d ON APRIL 14 AT 10: 45'A.M.
THE WATER INITIATED WodKERS THE FIDE CONTROL SAFEL( ,LEFT THESYSTEM AREA 0F THE AND THE PU W ITH CAR 90N DIOXIDE GAS. INJudIES.
REACTOR CONTAINMENT GUILDING 40 THERE *EdE NO dAID THE WATER HAS. SEEN CON TAINED A PHILADELPHIA ELECTRIC SPOKESMAN THE *ATER AND THERE IS NO DANGER OF RELEASE INTO THE ENVidONMENT. .
HA0 RECENTLY BEEN THROUGH THE RA0 WASTE SYSTEM.
. UNIT THREE HAS REEN 00WN FOR dEFUELING ANd MAINTENANCE SINCE MARCH THE UTILIff 00ES 6 AND IS EXPECTE0TO GO SACK IN SERVICE IN AUGUST.
NOT EXPECT THE INCIDENT TO DELAY STARTUP.
A SCAFFOLOING COLLAPSED IN A SEPARATE INCIDENT AT THE SAME REACT 08., IN TO fME HEACT06.
ON MONDAY, . APRIL 13 AND CAUSE0 SOME TOOLS TO Dd0P THERE a4S NO DAMAGE.
AE WILL CONTINUE TO KEEP Y0u INFORMED.
(ATOMIC ?NDUSTdHAL FORMUM 7108249602 AT0 HIC FNd DC).
2001 EST Mpe$
j'l NdC BH34 ,
fi 8 /
8104reeb%
s
_. .