Provides Responses to Reg Guide 1.97 Variable for Steam Generator Wide Level Instrumentation & SER for Plant & Requests That NRC Review Info & Consider Accepting Deviation on Merits of Existing Design
ML20006D280
Person / Time
Site: Beaver Valley
Issue date: 01/31/1990
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9002120319
Download: ML20006D280 (13)


Text

_

4-

. V9f Y$ IDy POW 9f $14110N

,- snippmap0ft. rA 15077 00o4 CE.NE%., orevo * ' " "

January 31, 1990 I

JU. S. Nuclear. Regulatory Commission >

Attnt Document Control Desk Washington, DC 20555 l Reference! Beaver Valley Power Station, Unit No. 1 ,

Docket No. 50-334, License No. DPR-66 ',

Responses to R. G. 1.97 Evaluations Gentlement This letter provides our responses to the Regulatory Guide 1.97 (RG. 1.97) variable for steam generator wide range (SGWR) level instrumentation and the RG 1.97 Safety Evaluation Report (SER) for Beaver Valley Power Station, Unit No. 1 (BVPS-1).

The NRC concern, regarding the SGWR level instrumentation, was initially identified during the Region I inspection on RG 1.97.

Conference calls were held on December 14 and 21, 1989 with the NRC to discuss the NRC staff's concerns. Our letters dated December 18 and 21' documented the respective conference calls. During the  ;

- conference -call on the 21st, we made .a commitment to provide a '

proposed resolution for the SGWR level instrumentation deviation.

Attachment 1 provides the resolution and includes additional information relevant to this issue which supports our original evaluation. -

By letter dated November 20, 1989 the NRC transmitted the SER on the BVPS-1 conformance to RG 1.97. In the letter, it was found that the BVPS-1 design is acceptable with respect to conformance with RG 1.97 except for the instrumentation associated with three variables.

Our responses to these items are contained in Attachment 2.

Please contact my office if there are any questions regarding +

this submittal, i Very truly yours, ,

b J. D. Sieber Attachments cc: Mr. J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager Mr. R. Scunders (VEPCO) ' p0) '

C. Anderson (Region 1)

'ip

' 9002120319 900131  ?% \

PDR ADOCK 05000334 P PDC f0 lj.-

. - ~ - .- - , -

ATTACHMENT 1 '

s .

  • Steam Generator Wide Rance Level Instrumentation Problem Descriotion The three wide range steam generator level channels are indicated and recorded on a single recorder. A failure of the power supply to the recorder would result in a loss of three wide range level 1 indications.

The three wide range level channels are powered from separate vital busses but are routed together in neutral cable trays from the sensors to the indicating and recording device. No isolation devices are installed. Regulatory Guide 1.97 describes steam generator level as a D1 variable.

Response

As discussed in our letter to the NRC dated December 21, 1989, we have performed the review to resolve the SGWR level instrumentation  ;

deviation to RG 1.97. Our proposed resolution is based on the following information.

In our letter of December 18, 1989, we provided the safety implications based on discussions in the UFSAR and with respect to the design basis events. We concluded that there are adequate diverse and independent instrumentation channels in accordance with RG 1.97 for accident diagnostics and mitigation of design basis events.

  • In. the same letter, we alsc tessed the issue of all three wide range indications appeari' n a common recorder. We indicated that the wide range leve adication is also provided to three separate computer systent ich, although they are not 1E, are battery backed systems. ncluded this information on Table 1 of the letter. The 7- Iso listed the alternate indications on the emergency sht -i panel, locally in the auxiliary feedwater pump rooms, and the control room and provided the power supply vital bus designations.

In the same letter, we also addressed the issue of the operators knowing how to respond to a loss of wide range steam generator level. We noted that the procedures require maintaining auxiliary feedwater flow to the steam generators until level is in the narrow range, thereby providing adequate guidance. This operator action provides assurance of an adequate heat sink.

Figure 2 to this attachment provides the logic model which we developed to show that the procedures are supported by the BVPS-1 design. The figure shows that additional systems are available to mitigate conditions leading to steam generator dryout. The logic model shows several success paths for supplying 350 gpm of auxiliary feedwater to any steam generator. The system is supplemented by an additional auxiliary feedwter pump, FW-P-4, which was included to satisfy Appendix R. The 4160V electrical supply for the auxiliary feedwater system will have another power source added for Station Blackout. The model also shows the redundancy of the river water supplies.

., . ATTACHMENT 1 Page 2 Finally, in reviewing the SGWR level instrumentation, we note that the configuration is similar to other three-loop plants.

Therefore, we are proposing the following resolutions to the SGWR level instrumentation deviation. Based on the above and the additional information provided in our responses of December 18 and 21, 1989, we believe that the existing configuration of the instrumentation and the design of the auxiliary feedwater system is adequate to monitor the steam generator levels and to ensure an ,

adequate supply of auxiliary feedwater to the steam generators. i consequently, we are requesting tr.at the NRC review this information i and consider accepting the deviation on the merits of the existing design. If the review results are favorable, the SGWR level will be changed to a- D2 variable for the BVPS-1. l To address the issue if the deviation is not acceptable, we will meet with you in order to come to an agreement on an acceptable resolution prior to the next refueling outage.

4 l

h Attcchment 1 4

~

Steam Generator Wide Range Level (Existing) .

LevelTransmitter Level Transmitter Level Transmitter LT - 477 LT - 487 LT- 497 LevelIndicator LevelIndicator LevelIndicator (Local) (Local) (Local)

LevelIndicator LevelIndicator LevelIndicator [

(Shutdown Panel) (Shutdown Panel) (Shutdown Panel) i L

Computer Signal Computer Signal Computer Signal Conditioner Conditioner Conditioner Power Supply Power Supply Power Supply l

L Pen 1 Pen 2 Pen 3 Level Recorder Q

Figure 1

?

, i l

e: e J

i, I ,

)

, .i i i i

..N' 4

lI=@hll1it-5 1 5 i g! 81-g

w

~

SHEET B1 PUMP C00mMLED PR0tt SIEETA FWH%A R$0FORDfWWEN 350 gun -  ;

h AEG WATER 4h 4 POWER .

1 I

OR TI *

- STARTS (NemL  ;

Tank I I (SEE SHEET WT-TK-10 gg dieV 16 SLPPLY BLEAE (1)

T h

h Gt OR n

j h i l I I I i l 1FP-P-2 WIW4AorB L3si 41 m V 1WRP-1A 1WRP-18 IWRP-1C ALKfWWER 2- T EDG BUSW

- == cRO NE N PLAr TE 04" DEADER osa.v) CosmMUED COlm MUED on SHEET 018 SHEET BE B2 (1) WT-TM-10 PROWIDES A rviaananal SUCTION TO FWHMA,

FWPM AND FWP-2  !

, = -_

. - . - . . - = -.. ~ - . . . ~ . . . . - , . . - - - - . . . -- - . - -

SHEET B2 -

CONTMED FROM 8tEETB1 4189Y "A" EDG . gusw a a AND OR-FUEL i COOueG $ l l l g----- q REDUNDANT 888T USST N

1 i e REL 1A 1C STORAGEAND OR TRAMBRER SYSTEM 3 h n

OFRNTE UNIT POWER GBEftATOR WRMER 1rRNER MTER WATER DE5ADER IEiADER '

IEFERTO SEET81 POR RMiRWATHt SOURCEB M RNURE EIEERGENCYSOURCE FROM tmf-2 FOR STATM)N MACMOUT s

= , _ , -

y -y <t -- .a e e- . . . , e

. .~ i

. z..  :.

1 4

Mar  ?-

SHEET C Fwe,m CONTINUEDFR0tf SPEETA 800TOROfWWBI l songpm b

ACD my b

.h i OR 419V RB'DP h TRABIT START n ERWGAL 9M!E9EET 6 "

)

t fWWER i ,

Wr-TK-10 140,000 WA1ER #V SLPPLY TEDG D geAons(1) "A"EADER h

ptARIE AS FOR (BRAUR10

- FWP,sA) - "A" M OR p_____,

WBT M g is 10 h a 1

OFF8HE LMT

GEBG M10R POWER a

(1) WT-M10 PROWIDES A(Yuananas gUCROf010 Fwe GA, M FUIUfE E3E3t(M30CYN N M N-2 IN-2 STATON IR.ACICOUT .i i

L

__z _ - - - - -_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______u*__

, --, ee" - wi _ --e+

_ zo_ - -

2___2__________m__ -

___._______v-____e

=___r^_ _ _ - -___-.w w w *

.t .

^d '

s .'

.'g L

SHEET D " rwe4 ColmMLED FROIA SPEETA sTEARIDFWEN Megun H

n STEAAgStPPLY WATER SJPPLY i i

~

ACG y i n n

i 3 E- N I

o,u h

gemens MPPLY .;

(1) TM .i ABC TV4ss.105A TV.esS-10ES MASFOft aansestamas OPEN OP90 HEADERS Ptsmasg2ED a g l

l di I I i

3 I l MW S q MW C00mt0L Aurostasu CONVROL autostafn "

gggyent OF POWER 1ReggA Agt PmWER yy,,, , .

i (1) wr-1K-10 PRDWWEB A twinsmanh8 SUC2010 TO FWP-44,- >

FWPS AND FWP4 i

~

,y ,9, ..- .-- -.

---#.,-g y 7,p., - .

em-,-- ,_.~c- c. ______,_.3 ___________2

____,._____,___s.

l

, 1 .  !

y ':

4 f

l 11 lifs 4 -

[

.\

(

$1#

g i Ilft g gi4r u 4 i i; hlA i p

i w

(

1

-I -

=

iIl m

W u

l-:

pw

,,.<[ <

q 1

lf  ;

I I s

3 s il ll

-1 i ql gli ,

1 i i 9, l'

!l.

in =

g

-4 - -4 4

4 . 4 , .a4 1.

(

y

? il Illl5 l lll Il l L , u. _ __._._.._.__._________________________________f

[ l

(. ,

.1 ATTACHMENT 2 ,

cC ' ' '

Page 1

.- 4 SER Item 4a Level and Pressure Indication for Accumulatorg

'NRC Position The acceptability of instrumentation for accumulator tank level and- pressure will remain open pending the outcome of our review of the need for environmentally qualified instrumentation to monitor this variable.- Our_ conclusion will be published when the generic review is complete.

Resnortgg We will review the generic resolution of these instruments and respond in accordance with the requested schedule.

SER Item 4b Neutron Flux Monitorina Instrumentation NRC Position It is our position that information provided by the neutron flux monitoring instrumentation is needed by the operator in the evaluation of proper reactivity control. It is also our position that the licensee shall install neutron flux monitoring instrumentation that is environmentally qualified in accordance with 10 CFR 50.49 and R. G. 1.97.

Response

We are continuing to review the technical aspects regarding the resolution for the neutron flux monitoring issue. We believe that there are several viable options. We are pursuing a resolution of this. issue with other utilities. The intent of the group would be to provide a more efficient means for resolving this issue with the NRC staff. We will provide a response by August 15, 1990 and meet with the staff, prior to this, for final resolution.

During the interim period, continued-operation is justified; since the existing instrumentation, required for reactor protection, would provide the intended safety function prior to the containment environment becoming hostile, it is considered qualified for its intended function.

ATTACHMENT 2

.C * ~ '" Page 2 EER' Item 4c Position Indicators for Containment Isolation Valves NRC Position It is our position that information provided by the containment isolation valve position indication instrumentation needs to be accurate to prevent mismanagement or improper operator action in the post-accident situation. It is also our position that the licensee should provide containment isolation valve position indication instrumentation that meets the acceptable seismic qualification requirements identified in the plant's license or Regulatory Guide 1.100. The licensee should determine which position indicator limit switches are located in a mild environment and provide environmentally qualified limit switches in accordance with 10 CFR 50.49 for those not located in a mild environment.

Response

We have completed the upgrade of the non-environmentally qualified ,

limit switches for the containment isolation valves inside containment. The upgrade was performed during the seventh refueling outage.

We will complete the upgrade of the position indication

, instrumentation for the containment isolation valves outside C

containment. We will perform this upgrade prior to startup from the ninth refueling outage. We consider this schedule reasonable to:

l

.l.- Minimize the annual accumulated radiation dose expected for j modifying these limit switches.

1

2. Integrate these modifications with anticipated design changes for Generic Letter 87-02 related to seismic design issucs for older plants.
3. Spread tha tequi,itS engifteering, prccurement, construction resenedes and capital expenditures over two refueling outages.

The existing qualification is justified on the basis that the L instrumentation is not expected to experience adverse conditions

' prior to the valve receiving an actuation signal to close.