TXX-3624, Final Deficiency Rept Re Procurement & Installation of Nonmetallic Insulation.Initially Reported on 830126.Matter Not Reportable Per 10CFR50.55(e)

From kanterella
Revision as of 11:10, 26 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Procurement & Installation of Nonmetallic Insulation.Initially Reported on 830126.Matter Not Reportable Per 10CFR50.55(e)
ML20071C865
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/25/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 19CFR-50.55E, TXX-3624, NUDOCS 8303080188
Download: ML20071C865 (1)


Text

TEXAS UTILITIES GENERATING COMIRNY a,ni n,nm un, en nu.imem mno .o e

'":b$b "."N:.':'

February 25, 1983 TXX-3624 kb$kYY .

W Mr. G. L. Madsen, Chief ( S 28 2 L; p/

Reactor Project Branch 1 \ IE U. S. Nuclear Regulatory Commission '

Office of Inspection and Enforcement 611 Ryan P1aza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC-STATION NON-METALLIC INSULATION QA, FILE: CP-83-03; SDAR-103 FILE NO.: 10110

Dear Mr. Madsen:

On January 26, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency regarding procurement and installation of non-metallic insulation.

We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.

Very truly yours,

  • a RJG:aq cc: NRC Region IV - (0 + 1 copy) -y Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 8303080188 830225 PDR ADOCK 05000445 S PDR

._