ML20072E130
| ML20072E130 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 07/31/1994 |
| From: | Feigenbaum T, Nardone P NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-94090, NUDOCS 9408220118 | |
| Download: ML20072E130 (5) | |
Text
n' ,
d g\% '; North Atlantic Energy Service Corporation j
h AT aOTO1 l 4 P.o. Box 300 l D@ Atlantic Seabrook, NH 03874 (603) 474 9521, Fax (603) 474-2987 l
l l
The Northeast Utilities System l Ted C. Feigenbaum NYN- 94090 Senior Vice President A Chief Nuclear Officer August 12,1994 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Reference:
Facility Operating License No. NPF-86, Docket No. 50-443
Subject:
Monthly Operating Report Gentlemen:
Enclosed please find Monthly Operating Report 94-07. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of July,1994 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very truly yetfr#
s, M-
du Ted C. Feigenbaum Enclosure cc: Mr. Thomas T. Martin Regional Administrator United States Nucicar Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Antone C. Ceme NRC Senior Resident Inspector PO Ilox 1149 Seabrook, Nil 03874 Dg, J P,(
A' 9408220118 940731 PDR ADOCK 05000443 R PDR
- s OPERATING DATA REPORT
, DOCKET NO. 50443 UNIT Seabrook i DATE 08/12/94 COMPLETED BY P.E. Nardone TELEPHONE 603/474-9521 Ext. 4074 OPERATING STATUS
- 1. Unit Name: Seabrook Station Unit i
- 2. Reponmg Period: JULY 1994
- 3. Licensed Thermal Power (MWt): 3411
- 4. Nameplate Rating (Gross MWe): 1197
- 5. Design Electncal Ratmg (Net MWe): 1148 6 Maximum Dependable Capacity (Gross MWe): 1200
- 7. Maximum Dependable Capacity (Net MWe): 1150 8 If Changes Occur in Capacity Ratings (ltems Number 3 through 7) Smee Last Not Apphcable Report Give Reasons:
- 9. Power Level To Which Restricted, if Any: None
- 10. Reasons For Restrictions, If Any: Not Applicable This Month Yr-to-Date Cumulative
- 11. Ilours m Reporting Period 744.0 5087.0 68280.0
- 12. Number of flours Reactor Was Critical 53 0 1886.9 29594.0 13 Reactor Reserve Shutdown llours 0.0 0.0 953.3 14 Ilours Generator On-Line 3.1 1800.8 27478.0
- 15. Umt Reserve Shutdown liours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 6114 6030046 89462493
- 17. Gross Elec. Energy Generated (MWH) 578 2104410 31078153
- 18. Net Electrical Energy Generated (MWil) 454 2022528 29846146
- 19 Unit Serviec Factor 0.4 35.4 75.4
- 20. Umt Availabihty Factor 0.4 35.4 75.4
- 21. Unit Capacity Factor (Usmg MDC Neo 0.1 34 6 72.4
- 22. Unit Capacity Factor (Using DER Net) 0.1 34.6 72.5
- 23. Unit Forced Outage Rate 0.0 23.5 7.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, None Scheduled and Duration of Each):
i 2$. If Shut Down At End Of Report Penod, Estimated Date of Not Apphcable l Stanup: l l
' NOTE: " Cumulative" salues based on total hours startmg 8/19/90, date Regular Full Power Operation began.
1of4
e .
AVERAGE DAILY UNIT POWER LEVEL 4
, DOCKET NO. 54443 UNIT Seabrook 1 DATE 08/12/94 COMPLETED BY P.E. Nardone i
TELEPHONE 9)3/474-9521 Ext 4074 MONTII: JULY,1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Neo (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 1 4 0 20 0 5 0 21 0 f 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 l l
10 0 26 0 l 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 19 16 0 INSTRUCTIONS On this format, hst the average d.nly unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l l
W 4
2 of 4 { ,
^
UNIT SIIUTDOWNS AND POWER REDUCTIONS -
DOCKET NO. 50443 i UNIT Seabrook 1 '
f ,
DATE 08/12/M .
COMPLETED BY P.E. Nardone TELEPilONE 603/474 9521 Ext. 4074 REPORT MO. Vill JULY.1994 NO. DATE TYPE' DURATION REASON2 METilOD OF SIIUITING LICENSEE EVENT CAUSE & CORRECTIVE ACTION TO PREVENT OIOURS) DOWN REACTOR' REPORT # RECURRENCE Page 1 of1 i
944)2 - 07/01/94 S 740.9 C 4 NA Scheduled Refucting Outage (Extended) i 3 F: Forced Reason: Method:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued from previous month E - Operator Trairung & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
II - Other (Explain) 3 of 4
REFUELING INFORMATION REQUEST DOCKET NO. 50 443 UNIT Seatirook 1 DATE 08/12/94 CONtPLETED BY P.E. Nardone TELEPHONE 603/474-9521 Ext. 4074
- 1. Name of Facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Refueling Outage 4, 01/06/96
- 3. Scheduled date for restart following refueling: Refueling Outage 4, 02/29/96
- 4. Will refueling or resumption of operation thereafter require a technical specifkation change or other license amendment?
No
- 5. Schedule date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: 193 (b) 208
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: l236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
1 I