ML20077J314
| ML20077J314 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/29/1983 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 77, W3I83-0255, W3I83-255, NUDOCS 8308160212 | |
| Download: ML20077J314 (1) | |
Text
I LOUISIANA / ,42Oua m e meu !
POWER & LIGHT / P O BOX 6008
- NdW ORLEANS. LOUISIANA 70174 * (504) 366-2345
{
$iEISNdYSSE )
July 29, 1983 i
W3183-0255
) Q-3-A35.07.77 3 [h [ h[M Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 NE - 91983
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 77
" Inadequate Containment Purge Valves Closure Time and Flow Rate" Fourth Interim Report
REFERENCE:
LP&L letter W3I83-0230 dated July 5, 1983
Dear Mr. Collins:
The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 29, 1983.
The supporting documentation for this SCD is presently under review. Completion of this review is expected in September 1983.
A Final Report will therefore be submitted to the USNRC by October 14, 1983.
Very truly yours,
//
F. J. Drummond pn m Project Support Manager - Nuclear FJD/WAC/ MAL:keh cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8308160212 830729 -
gDRADOCK 05000382 PDR
[h" 2-7 >
//O