RBG-16-226, Interim Deficiency Rept DR-110.Investigation Incomplete. Next Rept Will Be Provided by 840105

From kanterella
Revision as of 02:24, 27 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept DR-110.Investigation Incomplete. Next Rept Will Be Provided by 840105
ML20078P032
Person / Time
Site: River Bend 
Issue date: 10/25/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
DR-110, RBG-16-226, NUDOCS 8311030153
Download: ML20078P032 (1)


Text

f-GULF STATES UTILITIES COMPANY POSTOFFICE BOX 2951

  • BEAUMONT. TEXAS 77704 AREA COOE 409 838-6631 October 25, 1983 RBG- 16,226 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S.-Nuclear Regulatory Commission g g

-Region IV, Office of Inspection and Enforcement >--

- -e

' ' l 611 Ryan Plaza Drive, Suite 1000 I!

Arlington, Texas 76011.

m 2 7lo"3 " ' ' '

Dear Mr. Collins:

il

. . _ - - - e_

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-110 With regard to'DR-110, Gulf. States Utilities Company hcs not completed its investigation. -An interim or final status report will be provided by January 5, 1984.

Sincerely, M.

J. E. Boo er Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group f PJD JEb/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC Resident Inspector-Site 8311030153 831025

PDR ADOCK 05000458 S PDR 2e]7s0

--