TXX-4111, Deficiency Rept Re Error in Tolerances Used in Calibr of Adhesion Tester.Initially Reported on 840116.Condition Not Reportable Under 10CFR50.55(e).Evaluation Continuing & Completion Anticipated by 840515
| ML20080R392 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/15/1984 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-4111, NUDOCS 8402280268 | |
| Download: ML20080R392 (1) | |
Text
-
TEXAS UTILITIES GENERATING COMPANY MKYWAn' TOWER
- 400 NORTil OLIVE MTHEET. L.II. Mt
- DAI,LAN, TEXAM 75201
.mIdj.*S[.... , February 15, 1984 TXX-4111 Mr. E.H. Johnson, Chief
' Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PROTECTIVE C0ATINGS ADt.ESION TESTER ] g@@O b QA FILE: CP-84-05, SDAR-129 .'
l {~
FILE: 10110 I i i po / ' !7
Dear Mr. Johnson:
II
\w On January 16, 1984, we verbally informed your Mr. R.G.
a deficiency regarding an error in the tolerances used in[aylor_of- iihe calibration of the adhesion tester.
The preliminary analysis indicates this deficiency is not reportable under 10CFR50.55(e), however, we are continuing our evaluation. We anticipate enmpletion by May 15, 1984.
Very truly yours, M .J. Gary RJG:ln cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 p 2280268 840215 g DOCK 05000445 PDR A KMFINFON OF TEMS tlrff,fffEN EK.ECTNJC CfDffMNY