ML20081A853

From kanterella
Revision as of 02:57, 21 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 83-040/03L-0 & 83-041/03L-0
ML20081A853
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/18/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20081A855 List:
References
NUDOCS 8310270061
Download: ML20081A853 (1)


Text

uemas Addrese Alattma Power Company l 600 North 18th Street Post Offica Box 2641 " 'J I

Birmingham, Alabama 35291 Telephone 205 783-6081  !

e ~

t. ' N . n F. L Clayton, Jr. g!  !
. r,1.'.

Senior Vice President Flintridge Building

[*f{g} 'P O AlabamaPbwer the southem electic system g3 gd 7.1 b

October 18, 1983

' Docket No. 364 l

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant Unit 2 Licensee Event Reports Nos.

LER 83-040/03L-0 and LER 83-041/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly,

+swM F. L. Clayton J r.

FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies) eggysc# CO -)

8310270061 831010

}O" ) l PDR ADOCK 05 S

_ , _ . _ . -. _ .._, _ _ _ _ _