TXX-4739, Interim Deficiency Rept CP-86-05 Re Safety Class Pipe Supports Mounted to nonsafety-related Embedded Plates. Initially Reported on 860113.Evaluation Continuing.Next Rept Will Be Submitted by 860425

From kanterella
Revision as of 10:32, 11 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-05 Re Safety Class Pipe Supports Mounted to nonsafety-related Embedded Plates. Initially Reported on 860113.Evaluation Continuing.Next Rept Will Be Submitted by 860425
ML20154S534
Person / Time
Site: Comanche Peak 
Issue date: 03/25/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-05, CP-86-5, TXX-4739, NUDOCS 8604010310
Download: ML20154S534 (1)


Text

_

Log # TXX-4739 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER a 400 NORTH OLIVE NTREET. LB. 51

  • DALA.AS. TEXAS 78208 March 25, 1986 WILLIAM G. COUNSIL OscuTvvs wcs passioser

, (c, a ,, '

Oi PAR 2 81986 U "Mr. Eric;H.1 Johnson,-Director , h" Divis f or: of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N0. 50-445 SAFETY CLASS PIPE SUPPORTS MOUNTED TO NNS EMBEDDED PLATE SDAR: CP-86 INTERIM REPORT

Dear Mr. Johnson:

On. January 13, 1986, we verbally notified your Mr. T. Westerman of a deft-ciency involving four piping systems which have been identified as including safety class pipe supports trounted to non-safety related embedded plates. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4701, dated February 12, 1986. Constraints involving testing-inside the Unit 1 boundary for the remaining single support have delayed completion of our final report on this matter.

We are continaing our evaluation and anticipate completion of our final report by April 25, 1986.

Very truly yours, W. G. Counsil JWA/ arm c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 0

gae _.Dt PDR S

amw----

ADOCM 05000445 PDR as