.g o PETER E. KATZ Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvest Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 1
January 15,1999 1
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Clifts Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Desember 1998 Ooerating Data Reports i
The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have any questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989.
Very truly yours, PEK/HOO/bjd Attachments _
-9 cc: S. Fleishman, Esquire Resident Inspector, NRC
' E. Silberg, Esquire R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC S. S. Bajwa, NRC P. Lewis, INPO I
II. J. Miller, NRC K. N. l2rson, ANI
/ft
/
I ,
9901200371 981231 PDR ADOCK 05000317 R PDR l
OPERATING DisTA stEPORT Docket No. 50-317 Calvert Cliffs Unit 1 January 15, 1999 Prepared by Herman O. Olsen Telephone : (410) 4 95- 6734 REPORTING PERIOD DECEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 Year- Cumulative This month to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 7,235.5 152,991.6
- 2. HOURS GENERATOR ON LINE 744.0 7,184.1 150,074.0
- 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 4. NET ELECTRICAL ENERGY GENERATED (MWH) 637,527 6,116,771 121,623,360 l
l 1
i l
i 5
I
b --
l OPERATING. DATA REPORT l Docket No. 50-318 Calvert Cliffs Unit 2
~ January 15, 1999 Prepared by Herman O. Olsen
- l. Telephone : (410) 4 95-6734 j REPORTING PERIOD DECEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 Year- Cumulative j This month to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,402.6 145,393.1-
- 2. HOURS GENERATOR ON LINE 744.0. 8,394.2. 143,630.3
- 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 4. NET ELECTRICAL ' ENERGY GENERATED (MWH) 649,451 7,225,493 117,180,603 1
i l l l ..
l' i:
b
g .
e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317 .
_ UNITNAME Calven Cliffs - Ul
'DATE January 15.1999 COMPLETED BY 11erman O. Olsen TELEPilONE (4101495-6734 REPORTING MONTH Deceseber 1998 NO.
DATE TYPE DURATION REASON' METIIOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (ilOURS) - SilUTTING S: SCllEDULED DOWN* COMMENTS There were no shutdowns this month.
' 2 Method:
Reason:
A - Equipment Failure 1 - Manual -
B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F- Administrative G - Operational Error 11 - Other
. UNIT SHUTDOWNS AND POWER REDUCTIONS -
. DOCKET NO. 50-318 ..
UNIT NAME Calvert Cliffs-U2 DATE- January 15.-1909 COMPLETED BY lierman O. Olsen .
. TELEPHONE (4101495-6734 REPORT MONTH Deceamber 1998 NOi DATE TYPE ' DURATION REASON MET 110D OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (IIOURS) SilUTTING S: SCilEDULED DOWN* COMMENTS There were no shutdowns this month.
Reason: Method:
A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F- Administrative G - Operational Error iI - Other
i: DOCKET NO. 50 J D CALVERT CLIFFS - UNIT I ,
January 15,1999
SUMMARY
OF OPERATING EXPERIENCE e
f' December 1998 The unit began the month at 100% power.
On 12/02/98 at 0205 power was reduced to 30% to repair an intercept valve that was oscillating due to :
contr91 system problems. Power was returned to 100% at 1500.
The unit operated at 100% power for the remainder of the month.
l I
i-4 l
l.
Is
1 DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 January 15,1999 l
SUMMARY
OF OPERATING EXPERIENCE !
December 1998 I
)
l The unit operated at 100% power for the entire month.
I i
l i
i i
l
!