Forwards Insp Rept 50-346/97-15 on 971110-980107.No Violations Noted
ML20199F435
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/28/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20199F438 List:
References
50-346-97-15, NUDOCS 9802040012
Download: ML20199F435 (5)


See also: IR 05000346/1997015

Text

,~. . - .- -- .- _ - - - . - - . . _ - . - . - ...__. - - - - . - . . _ _._~ .-.

,

g.

g* v584roq UNITED STATES

8

4 g NUCLEAR REGULATORY COMMISSION

{

REGION til

y 801 WARRENVILLE ROAD

,, LISLE, ILLINOIS 60532-4351 I

%

,

9***** January 28, 1998

l

ur. John x. wood

Vlos Presiderd- Nuclear

>

Davie-Besse Nucisar Power Station

Centerior Service Company

5501 Nortn State Route 2 .

Oak Hartor, OH 43449

'

SUBJECT: NRC INSPECTION REPORT No. 50-346/97015(DRP}

, Dear Mr. Wood: i

on January 7.1998, the NRC completed an inspection at your Davis-Besse site. The enclosed

report presents the results of that irwpection.

4

During this inspection period, the plant was operated safely and in <accordance with plant

procedures. A minor plant transient caused by the failure of a servo control valve was effectively

handled by operators. Although your corrective action program was generally effective in

identifying and resolving issuss, a prior opportunity to identify the servo control valve problem

was missed by the engineering department. No violations of NRC requirements were identified,

in accordance with 10 CFR 2.790 of the NRC's " Rules of PractPa," a copy of this letter and its

enclosure will be placed in the NRC Pubk Document Room.

.

l Sincerely,

DV /fW W

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50 346 f

Ucense No.: NPF-3 I

i

, Enclosure: Inspection Report

No. 50-348/97015(DRP) [

! See Attached Distribution

$ II[ JII9llI .L!

9802040012 980128

PDR ADOCK 05000346

AhU$ }

_ . - . _ . _ _ . _ _ _ . . _ _ . . _ _ _ _ . _ _ - _ _ _ _ _ _ .

.. ,

-

..

i

,

  • ,'

J. Wood - 2..

4

oc wfencl: John P. Stetz, Senior

Vice President- Nuclear

J. H. Lash, Plant Manager

J. L Freels, Manager

Regulatory Affairs

State Liaison Omoor, State

of Ohio

Robert E. Owen, Ohio

'

Department of Heal.a

O. A. Glazer, State of Ohio,

Public Utilities Commission

>

>

i

1

4

4

a

. . . _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _ . _ . _ _ .. _ _ _ _ _ _ _ _ .. _ ._ .._ _ _ _ _

,

i

1

!

January 28, 1998

Mr. John K. Wood

Vice Presidert- Nuclear

l!. . . Deve Besse Nuclear Power Station

Centerior Service Company

]

L 5501 North State Route 2

oak Narbor, oN 43449

l

[ SUBJECT: NRC INSPECTION REPORT No. 50 346/97015(DRP) )

Dear Mr. Wood

.

i

On January 7,1998, the NRC completed an inspection at your Davis Besse site. The enclosed

4

report presents the results of that inspection.

During this inspection periM, the plant was operated safely and in accordance with plant

procedures, A minor plant transient caused by the failure of a servo control valve was e"ded;

handled by operators. Although your correctiie action program was generally effective in

identifying and resolving issues, a pitor opportunity to identify the servo control valve problem

was missed by the engineering department. No violations of NRC requirements were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-316

Ucense No.: NPF-3 -

Enclosure: Inspection Report

No. 50 346/97015(DRP)

,

See Attached Distribution

SEE PREVIOUS CONCURRENCES

DOCUMENT NAME: GMavlWav97015.dtp

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy

with attach /enci "N" = No copy

OFFICE Rlli Rlll Rlli

NAME Kozakinmo Creed /Section S.8 Grant Md'~

DATE 01/ 198 01/ /98 01/f//98

OFFICIAL RECORD COPY

i

! _. . _ . . _ _ _ _ _ _ _ _. . _. _ . . _ - __

. - . - .. . - . . .- - -- -

., .

..

'

.

-.

January 28, 1998

Mr. John K. Wood

Vice President - Nuclear

'

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor OH 43449

SUBJECT: NRC INSPECTION REPORT NO. 50-346/97015(DRP)

Dear Mr, Wood:

On January 7,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed

report presents the results of that inspection.

'

During this inspection period, the plant was operated safely and in accordance with plant

procedures. A minor plant transient caused by the failure of a servo control valve was effectively

handled by operators. Although your corrective action program was generally effective in

identifying and resolving isst ts, a prior opportunity to identify the servo control valve problem

was missed by the engineering department. No violations of NRC requirements were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director -

Division cf Reactor Projects

Docket No.: 50-346

License No.: NPF-3

Enclosure: Inspection Report

No. 50-346/97015(DRP)

- See Attached Distribution

DOCUMENT NAME: G:\davi\dav97015.drp

To receive a copy of this document, indicate b 'he box "C" = Copy without attach /enci "E" = Copy

with attach /enci "N" = No copy ,

OFFICE Rill b Rlli $ Rlll Rlli

NAME Kozak: nmo h Crbekon S.8 Grant

DATE 01///98

f.* c.! t.e** m

01[,/98 01/ /98 01/ /98

OFFICIAL RECORD COPY

l

l

1

_. . _ . _ _. _ _ _ _ . _ _ _ _ __. __ _ _ __ . _ . _ . . . _ _ _ . _ . . ._ . _

,

.

.

4

J. Wood -2-

ocw/ encl: John P. Stetz, Senior

Vice President- Nudear

J. H. Lash, Plant Manager

J. L Freets, Manager

'

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

'

Department of Health

C. A. Glazer, State of Ohio,

Public Utilities Commission

Distnbution-

i Docket File w/enci SRI Davis-Besse w/enci

PUBLIC IE-01 w/enci A. B. Beach w/enct

Project Manager, NRR w/enci Deputy RA w/enci

Rlil Enf. Coordinator w/enci Rill PRR w/enci

CAA1 w/enci(E-mail) DRS (2) w/onci

<

TSS w/onci DOCDESK (E-mail)

DRP w/onci

,