TXX-4944, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Next Rept Expected by 860926
| ML20204H900 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/30/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-19, TXX-4944, NUDOCS 8608080240 | |
| Download: ML20204H900 (1) | |
Text
._
Log # TXX-4944 File # 10110 910.3 TEXAS UTILITIES GENERATING COMPANY RKYWAY TO9/ER . 40J NORTH OI.JVE STREET. L.B. At . DALLAS. TEXA175201 July 30, 1986
==
T'R@lROMEWV
> 7 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects
( M-lg l i U. S. Nuclear Regulatory Commission J{'
611 Ryan Plaza Drive, Suite 1000 E Arlington, TX 76012 --
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 PRESSURE INSTRUMENT INSTALLATIONS SDAR: CP-86-19 (INTERIM REPORT)
Dear Mr. Johnson:
On March 21, 1986, we notified you of a reportable item involving the installation of steam service pressure transmitters (see TXX-4824). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).
We anticipate completing our evaluation of all corrective action and submitting our next report by September 26, 1986.
Very truly yours,
/ f W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies) ,
U. S. Nuclear Regulatory Commission 1 Washington, D.C. 20555 8608080240 860730 PDR ADOCK 05000445 S PDR
%k A DIVISION OF TEXAN UTELITIEN ELECTRIC COMP ANY
_ _ _ _ _ _ _ _ _ _ _ _ _