Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident
ML20209F657
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/12/1999
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20209F663 List:
References
50-341-99-09, 50-341-99-9, NUDOCS 9907160096
Download: ML20209F657 (2)


See also: IR 05000341/1999009

Text

^ *,

  • Abb UNITED STATES

/ \ NUCLEAR REGULATORY COMMISSION

[ o REGION lli

801 WARRENVILLE ROAD

U'8 LISLE. ILLINOIS 60532-4351

k***** July 12, 1999

,

Mr. D. R. Gipson

l Senior Vice President

Nuclear Generation

. The Detroit Edison Company

6400 North Dixie Highway.

Newport, MI 48166

'

SUBJECT: FERMI INSPECTION REPORT 50-341/90009(DRP) ,

1

Dear Mr. Gipson:

This refers to the inspection conducted on May 16 through June 18,1999, at the Fermi 2

facility. The enclosed report presents the results of this inspection.

During this inspection period, the plant was operated in a safe and conservative manner. In

l particular, the operators' decision to trip the plant following the unexpected loss of the reactor

recirculation pump was performed promptly and in accordance with procedures and license

requirements. Although accidental tripping of the reactor recirculation pump occurred during a

'

maintenance activity, maintenance personnel were thorough in the investigation of the root

cause of the event. Plant organizational response to fouling in several balance-of-plant heat

exchangers was prompt and effective.  ;

l

However, the plant configuration with Emergency Diesel Generator 11 removed from service )

while the opposite division's Standby Liquid Control System B was inoperable raised a l

Technical Specification 3.8.1.1.c compliance question. Though the compliance aspects of this l

'

Technical Specification (TS) issue are still under review, the occurrence of this situation

reflected some weaknesses in operations performance. Specifically, weak procedural

guidance, communications issues, and configuration control weaknesses were evident. Of

particular concem was the poor communication between operations and other site

organizations in the initial dispositioning of the acceptability of the configuration. In addition,

i

when this configuration was changed by opening the Standby Liquid Control Pump B breaker  ;

l for troubleshooting, the change in availability of the pump was not communicated and therefore  ;

not evaluated. Though overall operations performance during this inspection report period was

I good, as reflected in the excellent response to the unexpected recirculation pump trip, the

circumstances which led to the plant configuration in question indicate that enhancements may

l be necessary in the above mentioned operations performance areas.

!

I

i

9907160096 990712

PDR ADOCK 05000341

G PDR

t.

e.

..

D. Gipson -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ G. E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-341

License No. NPF-43

Enclosure: ' Inspection Report 50-341/99009(DRP) l

cc w/ encl: N. Peterson, Director, Nuclear Licensing

P Marquardt, Corporate Legal Department

R. Gaston, Compliance Supervisor

R.' Whale, Michigan Public Service Commission

Michigan Department of Environmental Quality

Monroe County, Emergency Management Division

Emergency Management Division

Ml Department of State Police

Distribution:

CAC (E-Mail) lI

. RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlll w/enci

B. Clayton, Rlli w!enci

SRI Fermi w/enci

DRP w/enci

DRS w/enci

~ Rlli PRR w/ encl

PUBLIC IE-01 w/ encl

Docket File w/enci

GREENS

- IEO (E-Mail)

DOCDESK (E-Mail)

160000 .

l

DOCUMENT NAME: G:\FERM\FER99009.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o att/ enc!"E" = Copy wlattlenci"N" = No copy

l OFFICE . Rlli ,/ l Rill l l l

-lNAME Vogel/co M Gran@di

lDATE- 07/lp /99' 074YhabU  !

OFFICIAL RECORD COPY i

!

, . -

,