JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)
| ML20210H033 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 07/22/1999 |
| From: | Michael Colomb POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| JAFP-99-0229, NUDOCS 9908030260 | |
| Download: ML20210H033 (3) | |
Text
James A. Fit 2 Patrick
, . Nuclear Power Pierit
. . 268 Leks Road l
- 3.
- P.O. Box 41 Lycoming, New York 13093 i 315 342 3840
- > NewYorkPower wcnaei J. Coiom3 j 4# Authonty site execut, e otr.cer i l
July 22,1999 l JAFP-99-0229 )
{
United States Nuclear Hegulatory Commission t Attn: Document Control Desk Mail Station P1-137 }
Washington, D.C. 20555
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 i Security Plan, Revision 19 Security Contingency Plan, Revision 5 l
References:
- 1. NYPA Letter, M. J. Colomb to NRC (JAFP-99-0124), Security Plan, 1 James A. FitzPatrick Nuclear Power Plant, Revision 19, dated April 7, 1999
- 2. NYPA Letter, M. J. Colomb to NRC (JAFP-99-0125), Security Contingency P!an, James A. FitzPatrick Nuclear Power Plant, Revision 5, dated April 7,1999 1
Dear Sir:
Contained in references 1 and 2 were three sets of attachments, which included a Summary of Changes and revised pages related to Revision 19 of the FitzPatrick Security Plan, and revision 5 of the FitzPatrick Security Contingency Plan.
Following the issuance of these revisions, it was identified ti:at the Summary of Changes included with each Plan did not accurately reflect all changes contained in the revisions.
This letter is being submitted to provide three sets of corrected Summaries of Cha:Qes for inclusion into the Security Plan, James A. FitzPatrick Nuclear Power Plant, Revision 19,
~
and the Security Contingency Plan, James A. FitzPatrick Nuclear Power Plant, Revision 5.
These enclosures are considered Safeguarde Information and are proprietary in accordance with 10 CFR 73.21 and 10 CFR 2.790(d)(1). Please inventory the contents of this letter and return the Document Receipt Form to Mr. Thomas H. Teifke, Security / Safety / Fire Protectior, Manager, New York Power Authority, James A. FitzPatrick Nuclear Power Plant.
9908030260 990722 PDR ADOCK 05000333 ;
p- PDR '
h l
l l
, Unit:d St2tzs Nucint R:gulatcry Ccmmissitn
. Attn: D cum:nt Crntral Disk
Subject:
Security Plan, Revision 19 and Security Contingency Plan, Revision 5 Page ,2-Questions concerning the contents of this letter may be addressed to Mr. Gordon Brownell at (315) 349-6360.
Very truly yours, Mic ael J. Colo Site Executive fficer MJC:GB:las Attachments as stated Cc: next page 1
l
cc: Rrgional Administrator (w/cnclosures) (2)
U. S. Nuclstr Rrgulatory Commission 475 Allendale Road
, , King of Prussia, PA 19406 Office of the Resident inspector (w/ enclosures)
U. S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycaming, NY 13093 Mr. G. Vissing, Project Manager (w/o enclosures)
Project Directorate 1 Division of Licensing Project Management U. S. Nuclear Regulatory Commission Mail Stop 8C2 Washington, DC 20b55 l
1 l
i l
1
. _ . . . _ . . _ _ _ . _ _ . . . .._ _.