ML21167A104

From kanterella
Revision as of 04:59, 9 September 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
6 - PRA Acceptability - Future Oversight of Risk-Informed Initiatives
ML21167A104
Person / Time
Issue date: 06/16/2021
From: Edgardo Torres
NRC/NRR/DRA
To:
Vasavada S
Shared Package
ML21167A163 List:
References
Download: ML21167A104 (4)


Text

PRA Acceptability - Future Oversight of Risk-Informed Initiatives Edgardo Torres Reliability & Risk Analyst PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 1

PRA Acceptability RG 1.200 Rev 3 PRA Acceptability

@ LAR RG 1.200 RG 1.200 Position C.1 Position C.2 Plant Technical Level of Representation ASME Peer Scope Elements Detail & PRA Standard Review Configuration control

PRA Configuration and Control PRA found acceptable Issuance of SE Plant Modifications Operating Experience Assessing the gap and Data PRA maintenance and upgrades 3

Future Challenges

  • Configuration Control Oversight

- Familiarization with Licensees programs

- Familiarization with Licensees technical elements analysis

  • Industry Collaboration:

- Information Gathering & Guidance Exercise at facilities

- Feedback 4