Ltr 08/18/17 Dresden Nuclear Power Station, Units 2 and 3 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000237/2017004; 05000249/2017004 (GFO)
ML17230A273
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/18/2017
From: O'Dwyer G F
Division of Reactor Safety III
To: Bryan Hanson
Exelon Generation Co
References
IR 2017004
Download: ML17230A273 (9)


See also: IR 05000237/2017004

Text

August 18, 2017

Mr. Bryan Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000237/2017004; 05000249/2017004

Dear Mr. Hanson:

On October 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than September 5, 2017. By September 12, 2017, the inspector will communicate the initial selected set of approximately 23 risk-significant heat exchangers. The second group is needed to support our in-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than October 3, 2017. This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes the additional information above as well as plant specific reference material. This information should be available onsite to the inspector on October 16, 2017. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection. The lead inspector for this inspection is Mr. . We understand that our licensing contact for this inspection is Mr. Dean J. Walker of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9624 or via e-mail at Gerard.ODwyer@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR

Sincerely,/RA/ , Reactor Inspector Engineering Branch 2 Division of Reactor Safety Docket Nos. 50237; 50249 License Nos. DPR19; DPR25

Enclosure:

Triennial Heat Sink Performance Inspection Document Request cc: Distribution via LISTSERV