DCS No.: 0500027107162008 Date: 07/16/2008 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
- PNO-1-08-009A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public
interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.
Facility Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station, Unit 1
Brattleboro, VT
Docket No.: 50-271
License No.: DPR-28 Licensee Emergency Classification Notification of Unusual Event Alert Site Area Emergency General Emergency X Not Applicable
SUBJECT:
UPDATE - WATER LEAK IN A COOLING TOWER AT VERMONT YANKEE
Entergy returned Vermont Yankee's west cooling tower to service at approximately 4:25 a.m. on
Wednesday, July 16. Entergy had removed the eas t and west towers from service on July 11, 2008, following the discovery of a 60 gpm leak in cell 1-1 in the east tower. The leak was
attributed to a broken horizontal pipe support located directly beneath the pipe. The towers
were removed from service to allow for extent of condition inspections and repairs.
An NRC special inspection team (SIT) was established in response to the July 11, 2008, leak.
The team, which arrived on site on Monday, July 14, has completed its near-term review of the
safety-related cooling tower cell (2-1) and the adjacent, seismically-qualified cell (2-2). The team reviewed the preliminary cause of the July 11 failure in cell 1-1 and ensured, through hands-on inspection, that similar degraded conditions do not exist in cells 2-1 and 2-2. The
team reviewed all deficiencies identified by the licensee in cells 2-1 and 2-2 and confirmed that
appropriate corrective actions were implemented.
For example, the licensee replaced cracked boards, and replaced a horizontal support structure that was not in accordance with the plant
drawings. Additionally, the team performed an independent structural inspection of cells 2-1
and 2-2. The team has determined that there are no conditions challenging the operability of
these cells.
The NRC has communicated these initial SIT results to state representatives from Vermont, New Hampshire, and Massachusetts.
The information presented herein has been discussed with Entergy and is current as of July 16, 2008, at 8:00 a.m.
This preliminary notification is being issued for information only.
ADAMS Accession Number: ML081980107
Contacts: B. Norris N. Sieller (610) 337-5111 (610) 337-5380 barry.norris@nrc.gov nicole.sieller@nrc.gov
DISTRIBUTIONS:
BY E-MAIL:
Chairman Klein Comm. Jaczko
Comm. Lyons Comm. Svinicki
OIP OCA OGC EDO OE NRR NMSS OIG RES ACRS FSME NRO NSIR OPA SECY Regional Offices
Commonwealth of Massachusetts
State of Vermont
State of New Hampshire
BY FAX:
DOT:Trans
INPO NSAC RI Resident Office Licensee:
Entergy Nuclear Operations, Inc.
Vermont Yankee Region I Form 83 (Rev. Nov. 21, 2006)
SUNSI Review Complete:
BN (Reviewer
=s Initials) ML081980107 DOCUMENT NAME: G:\DRP\PNs\PNO-I-08-009A - VY SIT on Cooling Towers bn.doc After declaring this document A An Official Agency Record
@ it will be released to the Public. To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy
O FFICE R I/DRP R I/PAO R I/SLO R I/DRP N AME B Norris/BN
D Screnci/DS
N McNamera /NM
J Clifford/DCL for
DATE 07/16/08 07/16/08 07/16/08 07/16/08 OFFICIAL RECORD COPY