|
---|
Category:NRO Safety Evaluation Report (SER)-Delayed
MONTHYEARML17291A1122019-04-0303 April 2019 Clinch River ESP Phase B SE, Section 13.6 ML18290A6852018-11-0909 November 2018 Clinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.4 (Redacted Version) ML17291A5472018-11-0808 November 2018 Clinch River Early Site Permit Safety Evaluation, Section 17.0 ML17289B1482018-11-0808 November 2018 Clinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.3 ML17289B2552018-10-0404 October 2018 Clinch River ESP Phase B SE, Sections 2.5.4 - 2.5.5 ML17289B2542018-10-0404 October 2018 Clinch River ESP Phase B SE, Section 2.5.3 ML17289B2522018-10-0404 October 2018 Clinch River ESP Phase B SE, Section 2.5.1 ML18242A1512018-09-14014 September 2018 Letter - Clinch River Nuclear Site Early Site Permit Application, Chapter 17.5 with No Open Items (Phase C) ML17291A0522018-07-20020 July 2018 Clinch River ESP Phase B SE, Section 13.3 - Conduct of Operations ML18102B1492018-04-30030 April 2018 Clinch River ESP Phase C SE Section 15.0.3 ML18102B1502018-04-30030 April 2018 Clinch River ESP Phase C SE Section 3.5.1.6 ML18102B2032018-04-30030 April 2018 Clinch River ESP Phase C Section 2.1 and 2.2 ML18102A6122018-04-12012 April 2018 Letter - Clinch River Nuclear Early Site Permit Application Safety Evaluations with No Open Items for Section 2.1, Section 2.2, Section 3.5.1.6, and Section 15.0.3 ML18102A6112018-04-12012 April 2018 Memo - Clinch River Nuclear Early Site Permit Application Safety Evaluations with No Open Items for Section 2.1, Section 2.2, Section 3.5.1.6, and Section 15.0.3 2019-04-03
[Table view] |
Text
2.1.1.1 Introduction Code of Federal Regulations2.1.1.2 Summary of Application 2.1.1.3 Regulatory Basis *
- 2.1.1.4 Technical Evaluation
°° 2.1.1.5 Conclusion 2.1.2.1 Introduction **
- 2.1.2.2 Summary of Application 2.1.2.3 Regulatory Basis
- 2.1.2.4 Technical Evaluation 2.1.2.5 Conclusion
2.1.3.1 Introduction
- 2.1.3.2 Summary of Application 2.1.3.3 Regulatory Basis *
2.1.3.4 Technical Evaluation
2.1.3.5 Conclusion 2.2.1.1 Introduction 2.2.1.2 Summary of Application 2.2.1.3 Regulatory Basis
- 2.2.1.4 Technical Evaluation
2.2.2.1 Descriptions of Facilities *****2.2.2.2 Descriptions of Products and Materials
2.2.2.3 Description of Pipelines 2.2.2.4 Description of Waterways 2.2.2.5 Description of Highways 2.2.2.6 Description of Railroads 2.2.2.7 Description of Airports, Aircraft, and Airway Hazards 2.2.2.8 Projection of Industrial Growth 2.2.2.9 Conclusion 2.2.3.1 Introduction *
- 2.2.3.2 Summary of Application 2.2.3.3 Regulatory Basis
- 2.2.3.4 Technical Evaluation
2.2.3.4.1 Explosions and Flammable Vapor Clouds
2.2.3.4.2 Toxic Chemicals
2.2.3.4.3 Fires
2.2.3.4.4 2.2.3.4.5 Liquid Spills 2.2.3.4.6
2.2.3.4.7 Conclusion