Final Accident Sequence Precursor Analysis - Clinton Power Station, Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram (LER 461-2017-010) - Precursor
ML19050A510
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/21/2019
From:
NRC/RES/DRA
To:
Chris Hunter 415-1394
References
LER 2017-010-002 IR 2017012
Download: ML19050A510 (20)


Text

Green

Green*

  • containment ventingoperator fails to vent containment through CCPoperator fails to vent containment through FC to SFPoperator fails to vent containment through RHR A to FPoperator fails to vent containment
  • 480V division 1 buses are unavailable
  • Clinton division I 125 VDC power is unavailableoperators fail to align the swing charger*loss of instrument air system initiating event has occurredClinton instrument airoperator fails to recover emergency diesel in 30 minutesoperator fails to recover emergency diesel in 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />soperator fails to recover emergency diesel in 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />soperator fails to recover emergency diesel in 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />sAC bus fails to operate operators fail to align the MSL drains to the condenserClinton condensate hotwell makeup is unavailable*Clinton transfer - one stuck open SRVClinton transfer - one stuck open SRVClinton late injection fault treeClinton late injection fault tree*general plant transient initiating event***main condenser heat sinkpower conversion systemgeneral transient RCIC support systems

-

-

operators fail to align the swing chargerNominalNominalNominal HEP = (Product of Diagnosis PSFs x Nominal Diagnosis HEP) + (Product of Action PSFs x Nominal Action HEP)= (1 x 0.01) + (1 x 0.001) = 1x10

-2 operators fail to align the MSL drains to the condenser ExpansiveNominalNominal HEP = (Product of Diagnosis PSFs x Nominal Diagnosis HEP) + (Product of Action PSFs x Nominal Action HEP)= (.01 x 0.01) + (1 x 0.001) = 1x10

-3