ML061790474

From kanterella
Revision as of 03:20, 27 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Palisades Petition Acceptance Letter Federal Register Notice for Consideration of Request for Action Under 10 CFR 2.206
ML061790474
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 06/27/2006
From: Wharton L R
NRC/NMSS/SFPO
To:
Wharton L R, NMSS/SFPO, 301-415-1396
Shared Package
ML061790447 List:
References
2.206
Download: ML061790474 (4)


Text

[7590-01-P]U. S. NUCLEAR REGULATORY COMMISSIONDOCKET NOS. 72-7 AND 50-255LICENSE NO. DPR-20NUCLEAR MANAGEMENT COMPANY, LLCCONSIDERATION OF REQUEST FOR ACTION UNDER 10 CFR 2.206AGENCY: Nuclear Regulatory CommissionACTION: Receipt and consideration of request for action under 10 CFR 2.206.FOR FURTHER INFORMATION CONTACT: L. Raynard Wharton, Senior Project Manager,Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguards, U.S. NuclearRegulatory Commission, Washington, D.C. 20555. Telephone: (301) 415-1396; Fax number:(301) 415-8555: E-mail: lrw@nrc.gov.INTRODUCTIONNotice is hereby given that by petition dated April 4, 2006, Mr. Terry J. Lodge (Counselfor Petitioners) has requested that the Nuclear Regulatory Commission (NRC) take action withregard to the Nuclear Management Company, LLC (NMC) Palisades Nuclear Plant (PNP). The petitioners' request that the NRC take enforcement action against PNP by condemning andstopping the use of the two independent spent fuel storage installation (ISFSI) concrete pads, constructed in 1992 and 2003, which hold dry spent fuel storage casks at the plant site. REQUESTAs the basis for the request, the petitioners state that both ISFSI concrete pads at PNPdo not conform to NRC requirements for earthquake stability standards and pose a distincthazard in the event of an earthquake.The request concerning slope stability of the 2003 concrete pad is being treatedpursuant to 10 CFR 2.206 of the Commission's regulations. The request has been referred to the Director of the Spent Fuel Project Office within the Office of Nuclear Material Safety and Safeguards. As provided by 10 CFR 2.206, appropriate action will be taken on this petitionwithin a reasonable time. Representatives of Mr. Lodge spoke with the Petition Review Board on April 26, 2006, to discuss the petition. The results of that discussion were considered in theBoard's determination regarding condemning and stopping the use of the two ISFSI concrete pads and in establishing a schedule for the review of the petition. By letter dated June 27, 2006, the Spent Fuel Project Office Deputy Director accepted the petition for review in part,specifically with respect to slope stability of the concrete pad constructed in 2003. FURTHER INFORMATIONA copy of the petition may be inspected at NRC's Public Electronic Reading Room athttp://www.nrc.gov/reading-rm/adams.html. This document may also be viewed electronicallyon the public computers located at the NRC's Public Document Room (PDR), O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852. The PDR reproductioncontractor will copy documents for a fee. Persons who do not have access to the NRC's Agencywide Documents Access and Management System (ADAMS) or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDRReference staff by telephone at 1-800-397-4209 or (301) 415-4737, or by e-mail to pdr@nrc.gov.Dated at Rockville, Maryland this 27 th day of June, 2006.FOR THE NUCLEAR REGULATORY COMMISSION/RA/L. Raynard Wharton, Senior Project ManagerSpent Fuel Project Office Office of Nuclear Material Safety and Safeguards Agencywide Documents Access and Management System (ADAMS) or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDRReference staff by telephone at 1-800-397-4209 or (301) 415-4737, or by e-mail to pdr@nrc.gov.Dated at Rockville, Maryland this 27 th day of June, 2006.FOR THE NUCLEAR REGULATORY COMMISSION/RA/L. Raynard Wharton, Senior Project ManagerSpent Fuel Project Office Office of Nuclear Material Safety and SafeguardsG:\SFPO\Wharton\2.206 Petition\palisades FRN.wpdML061790474OFCSFPOSFPOESFPOSFPO NAMELRWhartonEZiegler RNelson MRahimi forWRuland MWong for DATE06/21/0606/21/0606/27/0606/27/06OFFICIAL RECORD COPY