ML17256A036

From kanterella
Revision as of 12:40, 26 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Requalification Program Inspection: Seabrook Station Unit No. 1
ML17256A036
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/12/2017
From: Jackson D E
Division of Reactor Safety I
To: Nazar M
NextEra Energy Seabrook
References
Download: ML17256A036 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406

-2713 September 12, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

- SEABROOK STATION UNIT NO. 1

Dear Mr. Nazar:

In a telephone conversation on September 7, 2017, Mr. David Silk , Senior Operations Engineer, and Mr. Thomas Fouts , Continuing Training Supervisor

, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Seabrook Station Unit No. 1. The inspection is planned for the week of December 4, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC

-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish:

1) an index or summary of condition reports written in the past 2 years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past 2 years on simulator performance problems; 3) an index or summary of simulator performance test results in the past 2 years; and 4) the examination schedule, sample plan, written examinations

, and operating test scheduled for the week of the inspection to the NRC by the week of November 13, 2017. Mr. Fouts has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150

-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T

-5 F52), U.S.

Nuclear Regulatory Commission, Washington, DC 20555

-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150

-0018), Office of Management and Budget, Washington, DC 20503.

M. Nazar 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicl y Available Records (PARS) component of the NRC

's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. David Silk at (610) 337

-53 7 2. Sincerely, /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.

50-443 License No. NPF-86 cc: Distribution via ListServ

M. Nazar 3

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

- SEABROOK STATION UNIT NO. 1 DATED SEPTEMBER 12, 2017 DISTRIBUTION

(via email)

DDorman, RA (R1ORAMAIL Res)

DLew, DRA (R1ORAMAIL Res)

RLorson, DRP (R1DRPMAIL Res

) DPelton, DRP (R1DRPMAIL Res)

JYerokun, DRS (R1DRSMAIL Res BWelling, DRS (R1DRSMAIL RES)

FBower, DRP RBarkley, DRP MDraxton, DRP SGhrayeb, DRP PCataldo, DRP, SRI PMeier, DRP, RI ACass, DRP, Resident AA JBowen, RI, OEDO

RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource

ROPreports Resource DOCUMENT NAME:

G:\DRS\Operations Branch\SILK\Seabrook2017CorpNotifLtrRQL.docx ADAMS Accession N o. ML17256A036 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME DSilk DEJackson DATE 0 9/8/17 0 9/12/17 OFFICIAL RECORD COPY