ML12083A152

From kanterella
Revision as of 23:02, 29 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Watts Bar, Unit 2 - Final Safety Analysis Report, Amendment 108. Chapter 2 - Figure 2.4-65 Through 2.4-247
ML12083A152
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/05/2012
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML12083A152 (52)


Text

HYDROLOGIC ENGINEERING2.4-196WATTS BARWBNP-108Figure 2.4-65 thru Figure 2.4-67 Are Not Used 2.4-197 HYDROLOGIC ENGINEERINGWATTS BARWBNP-108THIS PAGE INTENTIONALLY BLANK 2.4-198HYDROLOGIC ENGINEERINGWATTS BARWBNP-108????Figure 2.4-68 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam HYDROLOGIC ENGINEERING2.4-199WATTS BARWBNP-108Figure 2.4-69 Deleted by Amendment 108 2.4-200 HYDROLOGIC ENGINEERINGWATTS BAR WBNP-108Figure 2.4-70 Deleted by Amendment 83 HYDROLOGIC ENGINEERING2.4-201WATTS BARWBNP-108Figure 2.4-71 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam 2.4-202HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-72 Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-203WATTS BARWBNP-108Figure 2.4-73 Deleted by Amendment 103 2.4-204HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-74 Deleted by Amendment 108 HYDROLOGIC ENGINEERING2.4-205WATTS BARWBNP-108Figure 2.4-75 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-206WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-76 Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam

HYDROLOGIC ENGINEERING2.4-207WATTS BARWBNP-108Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam HYDROLOGIC ENGINEERING2.4-208WATTS BARWBNP-108Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam HYDROLOGIC ENGINEERING2.4-209WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam HYDROLOGIC ENGINEERING2.4-210WATTS BARWBNP-108Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam HYDROLOGIC ENGINEERING2.4-211WATTS BARWBNP-108Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam HYDROLOGIC ENGINEERING2.4-212WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project HYDROLOGIC ENGINEERING2.4-213WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood HYDROLOGIC ENGINEERING2.4-214WATTS BAR WBNP-108Figure 2.4-84 Deleted by Amendment 63 HYDROLOGIC ENGINEERING2.4-215WATTS BAR WBNP-108Figure 2.4-85 Deleted by Amendment 63 HYDROLOGIC ENGINEERING2.4-216WATTS BARWBNP-108Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-217WATTS BARWBNP-108 Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-218WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-219WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project HYDROLOGIC ENGINEERING2.4-220WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam HYDROLOGIC ENGINEERING2.4-221WATTS BAR WBNP-108Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity HYDROLOGIC ENGINEERING2.4-222WATTS BARWBNP-108Figure 2.4-92 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-223WATTS BAR WBNP-108Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity HYDROLOGIC ENGINEERING2.4-224WATTS BARWBNP-108Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams HYDROLOGIC ENGINEERING2.4-225WATTS BAR WBNP-108Figure 2.4-95 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-226WATTS BARWBNP-108Figure 2.4-96 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-227WATTS BARWBNP-108Figure 2.4-97 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-228WATTS BARWBNP-108Figure 2.4-98 Not Used HYDROLOGIC ENGINEERING2.4-229WATTS BARWBNP-108Figure 2.4-99 Grading Plan Intake Channel HYDROLOGIC ENGINEERING2.4-230WATTS BAR WBNP-108Figure 2.4-100 Deleted by Amendment 83 HYDROLOGIC ENGINEERING2.4-231WATTS BAR WBNP-108Figure 2.4-101 Deleted by Amendment 33 HYDROLOGIC ENGINEERING2.4-232WATTS BAR WBNP-108Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site HYDROLOGIC ENGINEERING2.4-233WATTS BAR WBNP-108Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site HYDROLOGIC ENGINEERING2.4-234WATTS BAR WBNP-108Figure 2.4-104 Locations of Ground - Water Observation Wells HYDROLOGIC ENGINEERING2.4-235WATTS BAR WBNP-108Figure 2.4-105 Generalized Water-Table Contour Map January 1972 HYDROLOGIC ENGINEERING2.4-236WATTS BARWBNP-108Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System HYDROLOGIC ENGINEERING2.4-237WATTS BARWBNP-108Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System HYDROLOGIC ENGINEERING2.4-238WATTS BARWBNP-108Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)

HYDROLOGIC ENGINEERING2.4-239WATTS BARWBNP-108Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)

HYDROLOGIC ENGINEERING2.4-240WATTS BARWBNP-108Figure 2.4-110 (Sheet 1) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events HYDROLOGIC ENGINEERING2.4-241WATTS BARWBNP-108Figure 2.4-110 (Sheet 2) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events 2.4-242HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-111 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-243WATTS BAR WBNP-108Figure 2.4-112 OBE with Epicenter Within Area Shown HYDROLOGIC ENGINEERING2.4-244WATTS BARWBNP-108Figure 2.4-113 Deleted by Amendment 107 2.4-245HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year FloodFailure Wave at Watts Bar Nuclear Plant HYDROLOGIC ENGINEERING2.4-246WATTS BARWBNP-108Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF EventFailure Wave at Watts Bar Nuclear Plant HYDROLOGIC ENGINEERING2.4-247WATTS BARWBNP-108Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF EventFailure Wave at Watts Bar Nuclear Plant