ML093080682

From kanterella
Revision as of 16:19, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ltr. 11/02/2009 LaSalle Requalification Program Inspection
ML093080682
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/02/2009
From: Hironori Peterson
Operations Branch III
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
Download: ML093080682 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 2, 2009

Mr. Charles G. Pardee

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Pardee:

In a telephone conversation on October 27, 2009, Mr. M. Entwistle, Requalification Training

Lead, and Mr. B. Palagi, Senior Operations Engineer, made arrangements for the U. S. Nuclear

Regulatory Commission (NRC) to inspect the licensed operator requalification program at the

LaSalle County Station. The inspection is planned for the week of November 16, 2009, which

coincides with your regularly scheduled requalific ation examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your

NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their

biennial comprehensive requalification written examinations or annual operating tests as

necessary to support the NRC's inspection program needs. In order for the NRC to adequately

prepare for this inspection, please furnish the written examinations and operating tests

scheduled for the week of the inspection to the NRC by November 9, 2009. Mr. Entwistle has

been advised of this request and provided with the name and address of the NRC lead

inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this

collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for

reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PAR S) component of NRC's Agencywide Documents

Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matte

r. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely, /RA/ Hironori Peterson, Chief Operations Branch

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

cc: Distribution via ListServ J. White, Training Department

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PAR S) component of NRC's Agencywide Documents

Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matte

r. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely, /RA/ Hironori Peterson, Chief Operations Branch

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

cc: Distribution via ListServ J. White, Training Department

DISTRIBUTION

Susan Bagley RidsNrrDorlLpl3-2 Resource

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII DRSIII Patricia Buckley

Tammy Tomczak

John McHale

DOCUMENT NAME: G:\DRS\Work in Progress\LAS 110209 DRS OL Requal Insp.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy ofis document, indicate in the box:

"" = Copy without attachment/encloure " E" = Copy with attachment/enclosure " N" = No copy th C s O FFICE R III R III N AME B Palagi:co

H Peterson

DATE 11/02/09 11/02/09

OFFICIAL RECORD COPY