Request for: EA-12-051 Approved, Closed | |
| From | |
MONTHYEARDCL-16-077, Pacific Gas and Electric Companys Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) for Diablo Canyon Power Plant Un2016-07-28028 July 2016
[table view]Title: Pacific Gas and Electric Companys Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) for Diablo Canyon Power Plant Unit Site: Diablo Canyon 05000323/LER-2016-001, Regarding Reactor Trip Breakers Manually Opened During Shutdown Due to a Control Rod Movable Gripper Fuse Failure2016-07-28028 July 2016 Title: Regarding Reactor Trip Breakers Manually Opened During Shutdown Due to a Control Rod Movable Gripper Fuse Failure Site: Diablo Canyon ML16349A3862016-12-28028 December 2016 Title: Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Site: Diablo Canyon 2016-12-28 | |
Retrieved from "https://kanterella.com/w/index.php?title=CAC:MF0958&oldid=615161"