ML23045A366

From kanterella
Revision as of 08:05, 15 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Comment (644) of Rhonda D. Wright, on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2
ML23045A366
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/12/2023
From: Wright R
- No Known Affiliation
To:
Office of Administration
References
NRC-2022-0183, 87FR76219 00644
Download: ML23045A366 (1)


Text

2/14/23, 3:09PM blob:https://www.fdms.gov/817d9f3e-68d8-4632-aa32-b163d01a411d

SUNI Review CompleteAs of: 2/14/23, 3:09 PM Template=ADM-013 E-RIDS=ADM-03 Received: January 12, 2023 PUBLIC SUBMISSIONADD: Tam Tran, Ted Status: Pending_Post Smith, Antoinette Tracking No. lct-l60e-5csd Walker-Smith, Mary Comments Due: January 30, 2023 Neely Submission Type: API Comment (644)

Publication Date:

Docket: NRC-2022-0183 12/13/2022 Citation: 87 FR 76219 Vistra Operations Company LLC Comanche Peak Power Company LLC Comanche Peak Nuclear Power Plant, Units 1 and 2

Comment On: NRC-2022-0183-0003 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2

Document: NRC-2022-0183-DRAFT-0644 Comment on FR Doc # 2022-27025

Submitter Information

Name: Rhonda D. Wright MD Email: rdwright67@gmail.com

General Comment

RE: Docket ID NRC-2022-0183

Dear NRC:

Dont extend aging Comanche Peak nuclear licenses.

I urge you to reject the application by Vistra to extend the operating licenses for the Comanche Peak nuclear power reactors for an additional 20 years. To protect public health, safety, security, and financial health, the reactors should retire as licensed, on or before 2030 and 2033.

I request that in-person scoping meetings be held in Texas, as originally planned, when Covid risks subside. I request that a hearing opportunity be allowed for those seeking to intervene and that the deadline for requesting a hearing be postponed for 90 days past the current January 30 deadline.

Both an afternoon and evening public meeting were scheduled, but then postponed at the last moment, without adequate public notice. Four hours of in-person meeting time were reduced to only two hours online. There is now no evening opportunity to participate for people who work in the day, and not everyone can access online meetings. There will be no exhibits or opportunity to speak directly with NRC staff.

I am concerned about the increased safety and financial risks that would result from allowing another 20 years of Comanche Peak nuclear reactor operation. Risks from stress corrosion cracking, metal fatigue and embrittlement would all increase, and thereby increase accident risks and the potential for radiation releases. There are 7.76 million residents in nearby Dallas/Ft. Worth. Public health and safety should come first in this decision.

blob:https://www.fdms.gov/817d9f3e-68d8-4632-aa32-b163d01a411d 1/2 2/14/23, 3:09PM blob:https://www.fdms.gov/817d9f3e-68d8-4632-aa32-b163d01a411d

Scoping should consider that there is no need for 20 more years of nuclear power. Renewable solar and wind generation are the most affordable and safest way to meet energy needs. Texas has abundant renewable resources to tap and a grid to move the power as needed.

Seismic concerns of both the reactors and the Squaw Creek Reservoir need to be re-examined in light of recent earthquake activity. Comanche Peak is within the Barnett Shale, a region with extensive fracking and numerous injection wells. There are fault lines in the area and a magnitude 3 earthquake had its epicenter only 20 miles from the site. The reservoir water contains radioactive tritium, and the integrity of the earthen dam must be included in the scoping, including the extent of inspections and past and anticipated impacts to the dam from seismic activity.

Please extend the deadline for intervention and host in-person meetings and hearings.

Thank you.

blob:https://www.fdms.gov/817d9f3e-68d8-4632-aa32-b163d01a411d 2/2