ENS 55049
From kanterella
ENS Event | |
---|---|
18:35 Dec 24, 2020 | |
Title | Automatic Turbine and Reactor Trip |
Event Description | At 1235 CST on December 24, 2020, Callaway Plant was in Mode 1 at approximately 90 percent power when a turbine trip/reactor trip, from a vital main generator trip signal, occurred. All safety systems responded as expected with exception of an indication issue with the 'B' Feedwater Isolation Valve, which was confirmed closed, and one intermediate range nuclear instrumentation channel which failed off-scale low following the trip. A valid Feedwater Isolation Signal and Auxiliary Feedwater Actuation Signal were also received as a result of the plant trip. The plant is being maintained stable in Mode 3.
All control rods fully inserted from the reactor trip signal, and decay heat is being removed via the Auxiliary Feedwater and Steam Dump Systems. The NRC Senior Resident Inspector was notified. |
Where | |
---|---|
Callaway Missouri (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.35 h-0.0979 days <br />-0.014 weeks <br />-0.00322 months <br />) | |
Opened: | John Lauf 16:14 Dec 24, 2020 |
NRC Officer: | Andrew Waugh |
Last Updated: | Dec 24, 2020 |
55049 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 55049\u003C/a\u003E - \u003Ca href=\"/Callaway\" title=\"Callaway\"\u003ECallaway\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Turbine and Reactor Trip\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 55049 - Callaway\n","link":"","lat":38.76076111111111,"lon":-91.78175833333333,"icon":"/w/images/0/06/Ameren_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (90 %) |
After | Hot Standby (0 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_55049&oldid=3085687"