ML20199B349
| ML20199B349 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/31/1997 |
| From: | Ewing E, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-97-0257, W3F1-97-257, NUDOCS 9711180281 | |
| Download: ML20199B349 (7) | |
Text
,-
- Entergy
- a,_
Entergy Operations. inc.
Tel 504 739 6242 Early C. Ewing. lit b
afety & Regulawy Man W3F197-0257 A4.05 PR November 14,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of October,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739 6666.
Very truly yours, e
{ll
~'
E.C. Ewing Director Nuclear Safety & Regulatory Affairs j
f ECE/ PRS /ssf Attachment cc.
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Reconis Center), NRC Resident inspectors
,,.. n c f, p, Office
~
fdi1 @ $7 &
!!!,5k!k!]Ni!i R
PDR u
'a NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for October,1997 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period, uw
_ =.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for October,1997 There were no pressurizer safety valve failures or challenges experienced during the month.
nw r. :
.r.
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
November 5,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504)739-6575 OPERATING STATUS
- 1. Reporting Period October,1997 Gross Hours in Reporting Period 745
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 745.0 4,774.s 89,07s.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 745.0 4,697.4 88,021.7
- 8. Unit Reserve Shutdown Hours 0.0 0.0 o.o 9, Gross Thermal Energy Generated (MWh, 2,523,657 15,769,777 292,027,142
- 10. Gross Electrical Energy Generated (MWH) 856,440 s,347,400 97,533,sso
- 11. Net Electrical Energy Generated (MWH) s21,520 s.101,420 93,034,081
- 12. Reactor Service Factor 100.0 65.4 84.0
- 13. Reactor Availability Factor 100.0 65.4 84.0
- 14. Unit Service Factor 100.0 64.4 83.0
- 15. Unit Availability Factor 100.0 s4.4 83.0
- 16. Unit Capacity Factor (using MDC) 102.s 65.0 81.s
- 17. Unit Capacity Factor (using DER) 99.9 63.3 79.4
- 18. Unit Forced Outage Rate 0.0 0.0 3.s
,,,,. m.
OPERATING DATA REPORT DOCKET NUMBER :
50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
November 5,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS (Contj
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 745
- 7,296 106,105
- 23. Unit Forced Outage Hours o.0 0.0 3,21s.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A O NOTE: Hours in October = (31 days in October X 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day) + 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> gained on October 26. 1997 for Daylight Savings Time Shift = 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />. + 1 hr.=
745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br />.
W Page : 4 of t
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 j
DATE OF REPORT : November 5,1997 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739-6575 Reporting Period :
October,1997
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 3
1 1,100 16 1,103 2
1,100 17 1,100 3
1,095 18 1,105 4
1,094 19 1,108 5
1,099 20 1,106 6
1,101 21 1,100 7
1,102 22 1,104 8
1,102 23 1,105 9
1,102 24 1,105 10 1,103 25 1,105 11 1,102 26 1,105*
12 1,102 27 1,106 13 1,102 28 1,106 14 1,102 29 1,106
~
15-1,102 30 1,106 31 1,105 INSTRUCTIONS :
On this form, liet the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
- NOTE: Used 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> on October 26 for implementation of Daylight Savings Time.
e :,.r.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 5,1997 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739-6575 REPORTING PERIOD :
October,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) uw r:.a.
. -.