MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] |
Text
.
D ALTIMORE GAS AND ELECTRIC CHARLES CENTER R O. BOX 1475 BALTIMORE MARYLAND 21203 JOSEPH A.TIERNAN vict PassiDENT NucttAm ENamGf June 13,1988 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Reauest for Amendment
REFERENCES:
(a) Letter from Mr. J. A. Tiernan (BG&E) to NRC Document Control Desk, dated March 15, 1988, same subject (b) Letter from Mr. F. J. Miraglia (NRC) to All Power Reactor Licensees and Applicants, dated March 22, 1988, "Removal of Organization Charts from Technical Specification Administrative Control Requirements (Generic Letter 88-06)"
Gentlemen:
The Baltimore Gas and Electric Company hereby requests an Amendment to its Operating f License Nos. DPR-53 and DPR-69 for Calvert Cliffs Unit Nos.1 & 2, respectively, with the submittal of the proposed changes to the Technical Specifications.
CIIANGE NO.1 (BG&E FCR 88-80)
Change pages 6-1, 6-6, 6-7, 6-8, 6-13, 6-14 and 6-22 of Unit I and Unit 2 Technical Specifications as shown on the marked-up pages attached to this transmittal.
[ Qq DISCUSSION Mao O
.o The proposed change will revise the title of the positions Marager-Nuclear Operations
$n and General Supervisor-Operations to be Manager-Calvert Cliffs Nuclear Power Plant and CO O General Supervisor-Nuclear Operations, respectively. This change is merely an admin-ny istrative change to the position titles and therefore, does not change the plant 38 organization or its present duties and responsibilities, op
.o u i
$fa. 00 ' k. .l$.0 l 6
' '\\
.# ;y@ fgA\
W .. . _ .
Document Control Desk June 13,1988 Page 2 ,
l The title of Manager-Nuclear Operations is being changed to clarify the responsi-bilities of the position. The position's function and requirements within the organization are not being changed as a result of this request. The title of General Supervisor-Nuclear Operations is being revised to reflect BG&E corporate policy.
Justification i
The proposed changes to the job titles will clarify the responsibilities and authority !
of the positions within the Nuclear Energy Division. These changes do n21 revise or j alter the function or responsibilities, l
l i DETERMINATION OF SIGNIFICANT llAZARDS '
This proposed change has been evaluated against the standards in 10 CFR 50.92 and has been determined to involve no significant hazards considerations, in that operation of i the facility in accordance with the proposed amendment would not: 1 l
(i) involve a significant increase in the probability or consequences l of an accident previously evaluated; or Justification:
No modification to the facility or our operational philosophy will be made by this proposed change. This change is administrative in nature, and therefore, does not affect those accidents evaluated in the Final Safety Analysis Report (FSAR),
(ii) create the possibility of a new or different type of accident from any accident previously evaluated; or
, Justification:
i No new or different kinds of accidentt from those previously evaluated in l the FSAR are created by this change. This change is administrative in nature, and therefore, does not create new or different conditions than those already evaluated by the FSAR.
(iii) involve a significant reduction in a margin of safety.
jsjtification:
The proposed change revises only the titles of the Manager-Nuclear
, Operations and General Supervisor-Operations, The responsibilities of these positions, as described by both the Technical Specifications and the
- FSAR, will remain the same. The change does not affect the plant organiza-tion or its responsibilities as discussed in the FSAR. Therefore, safety is not effected.
_ _ , _ . - . _ _ _ - _ _ , _ _ , _ _ - . -- . - _ _ - - - - - . . = , , - . _ . - - . -
Document Control Desk June 13,1988 Page 3 CHANGE NO. 2 (BG&E FCR 88-80)
Change pages XV, 6-1, 6-2 and 6-3 of Unit I and Unit 2 Technical Specifications as shown on the marked-up pages attached to this transmittal.
DISCUSSION The proposed change removes the onsite and offsite organization charts from the l Technical Specifications. Additional general requirements that capture the essential l aspects of the organizational structure are added to the administrative controls. The I removal of the organization charts will provide greater flexibility for us to implement changes in both the onsite and offsite organizational structure. We believe this is consistent with Commission policy.
l l This change supplements CHANGE NO.1 in that we assume for purposes of argument that I the requested title changes have been approved. The marked-up pages are combined to l simplify the change and to reflect both requested changes.
This proposal also would delete the organization chart proposed in Reference (a), I CHANGE NO.1, but would not change the intent of that Request for Amendment. We still l desire to add the position of Assistant General Supervisor-Operations (AGS-0) to our l organization structure. In addition, we want to remove the senior reactor operator l l (SRO) license requirement for the General Supervisor-Operations and impose that l training requirement on the AGS-O instead. Those proposed changes are described in I
Reference (a) in detail. They are not reflected in this change because this request would exceed the limitations of Reference (b) which requires that any amendment request i must reflect the existing Technical Specifications. Therefore, this change supplements Reference (a).
JustificatiSn Many of the details shown on the onsite and offsite organization charts are not essential to the safe operation of the facility. However, to support removing the organization charts, we are proposing administrative controls under Section 6.2.1 on page 6-1 necessary to ensure the operation of the facility in a safe manner. This change is being submitted under the guidance of Reference (b). The organizational i characteristics described in Reference (b) which are important to safety have been included in our submittal. These are:
l (1) A requirement that lines of authority, responsibility, and communication i shall be established and defined from the highest management levels through intermediate levels to and including all operating organization positions.
l Those relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation.
l
. l Document Control Desk i June 13,1988 i Page 4 j (2) Designation of an executive position that has corporate responsibility for overall plant nuclear safety and authority to take such measures as may be needed to ensure acceptable performance of staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.
(3) Designation of a management . position in the onsite organization that is responsible for overall unit operation and has control over those onsite activities necessary for safe operation and maintenance of the plant.
(4) Designation of those positions in the onsite organization that require a senior reactor operator (SRO) or reactor operator (RO) license.
(5) Provisions of sufficient organizatioaal freedom to be independent of operational pressures to those individuals who perform the functions of health physics, quality assurance, and training of the operating staff.
These conditions are reflected in our proposed change.
The organizational information described in (1) above is incorporated in our FSAR. Tb FSAR currently contains organization chcrts to at least the level of detail as shown on those which we propose to remove from the Technical Specifications.
The qualifications (SRO or RO license) for the General Supervisor - Nuclear Operations, Shift Supervisor, Control Room Supervisor and Control Room Operator are designated by I organization charts in the FSAR. i l
We have examined our plant Technical Specifications for additional references to the i organization charts. No other references have been identified. l i
During our review of the organization charts, we discovered a discrepancy between tha l Technical Specifications and a chart in the FSAR. On the attached copy of page 6-3 the l discrepancy is circled. Apparently, during our last reorganization, we inadvertently indicated that Nuclear Security is responsible to the Manager - Calvert Cliffs Nuclear Power Plant. This is not true. The organization chart in our FSAR (Figure 12-3) is correct. By deleting the organization charts from the Technical Specifications, the problem will be corrected.
Other than the item discussed above, the charm in the FSAR and Technical Specifica-tions are consistent. In fact, Figure 12-2 of our FSAR shows greater detail than Figure 6.2- 1 of the Technical Specifications. There are no other inconsistencies.
We understand that this request will be reviewed and approved quickly as long as it conforms to the guidance in Reference (b). We believe our proposed amendment meets all of the Generic Letter's requirements.
Document Control Desk June 13,1988 Page 5 DETERMINATION OF SIGNIFICANT IIAZARDS This proposed change has been evaluated against the standards in 10 CFR 50.92 and has been determined to involve no significant hazards considerati . ens, in that operation of the facility in accordance with the proposed amendment would not:
(i) involve a significant increase in the probability or consequences of an accident previously evaluated; or Justification:
No modification to the facility or our operational philosophy will be made by this proposed change. This change is administrative in nature, and therefore, does not affect those accidents evaluated in the Updated FSAR.
(ii) create the possibility of a new or different type of accident from any accident previously evaluqted; or Justification:
No new or different types of accidents from those previously evaluated in the FSAR are created by this change. Removing the organization charts from the Technical Specifications and relying on those in the FSAR still ensures appropriate controls on changes to the organization will exist due to comr.1itments referenced in the FS A R, and the 10 CFR 50.54 and 50.59 requirements.
(iii) involve a significant reduction in a margin of safety.
Justification:
This proposed change does not involve any reduction in the margin of safety. Administrative controls relating to organization and management necessary to ensure operation of the facility in a safe manner will be maintained as described in the FSAR. We are proposing a change which would ensure adequate controls over changes to the BG&E organization structure through the normal FSAR revision process, and the requirements of 10 CFR 50.54 and 50.59.
T5AR UPDATE We are currently planning a site reorganization to take effect on September 1, 1988.
As requested by members of your staff, we will perform a safety analysis for the change ,
in accordance with 10 CFR 50.59 on or before that date. This safety analysis will l include an organization chart representing the new organization in detail equivalent to '
l Figure 6.2- 2 of our current Technical Specifications. This chart will not represent or describe any organizations below the section level.
We request that the requirement for functional and job descriptions be deferred until 90 days after the reorganization takes place. This will allow our company sufficient l time to make the necessary changes and updates. l
a . .
j Document Control Desk June 13,1988 Page 6 l
l SAFETY COMMITTEE REVIEW These proposed changes to the Technical Specifications and our determination of significant hazards have been reviewed by our Plant Operations and Off-Site Safety Review Committees, and they have concluded that implementation of these changes will not result in an undue risk to the health and safety of the public.
FEE DETERMINATION Pursuant to 10 CFR 170.21, we are including BG&E Check No. 1916898 in the amount of
$150.00 to the NRC to cover the application fee for this request.
Very truly ours, akau-STATE OF MARYLAND :
- TO WIT:
L $l 0LlLWC :
I hereby c rtify that on the /.3 t/t day of b/Lc i .19 38, before me, the subscriber, a Notary Public of the State of Mar nd in and for & M7m W (8/ : u.4 k
~
, personally appeared Joseph . Tiernan, being duly sworn,vand states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.
WITNESS my Hand and Notarial Seal:
/
LLb< I 1414 /
ptary'Public l
My Commission Expires: /t.Iu /. /h9d ;
(/ g D(te JAT/SRC/dtm Attachments j cc: D. A. Brune, Esquire i J. E. Silberg, Esquire 3
R. A.Capra, NRC 1
S. A. McNeil, NRC W. T. Russell, NRC D. C.Trimble, NRC T. Magette, D' '