Forwards Overview of Design Concept for TMI-1 in Response to NUREG-0696 Re post-TMI Requirements for Emergency Operations Facility.Conceptual Design Info & Projected Completion & Operation Schedule to Be Completed 810901
ML20004F029
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/10/1981
From: Hukill H
METROPOLITAN EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0696, RTR-NUREG-696 L1L-175, NUDOCS 8106160410
Download: ML20004F029 (2)


Text

.

5 Metropolitan Edison C2mpany

, Post Office Box 480 Il Middletov.n. Pennsytvania 17057 Writer's Direct Dial Number June 10, 1981 .pi,$.i ~

L1L 175 g L'[

Office of Nuclear Reactor Regulation ,

/[

Attn: Mr. Darrell G. Eisenhut, Director - 1 .

9i

,, ,I .l J g O Cl A - /

~

Division of Licensing U. S. Nuclear Regulatory Commission

Washington, D.C. 20555  %:$Is!$rce, Dd .

Dear Sir:

  • ~,. '//

Three Mile Island Nuclear Station, Unit 1 'TMI-1)

Operating Licens,e No. DPR-50 Docket No. 50-289 Post TMI Requirements for the Emergency Operations Facility In response to your letter dated February 18, 1981, we submitted a letter dated April 16, 1981, expressing our commitment to provide the conceptual design of Emergency Response Facilities and the schedule for completion and operation of those facilities. Our thorough review of NUREG 0696 has necessitated working towards a consolidated and consistent corporate position to be implemented not only for the Three Mile Island Stati6n, but alco for our Oyster Creek Station. As a part of that process, we are presently focusing our attention on proper coordination of the Emergency Response Facilities for both plants from a corporate standpoint. Our effort

, to come up with the conceptual design information meeting the intent of NUREC 0696 and the corresponding engineering schedule is still underway due to the need for coordination. The attachment I to this letter furnishes an overview of the design concept for Three Mile Island Unit 1.

We expect to forward the conceptual design information on September 1, 1981 along with the projected completion and operation schedule.

Sincerely,

. D. ukill Director, TMI-l HDHCWS:lma Attachment cc: D. DiIanni W. Silver /

L. Barrett N['s \

Metropohtan Edison Company is a Member of the Genera! Pub'ic Utihties System 816616e4jo - -. __ _ ___ _ _ _

. _ _ . . _~ -- . - -. -. . - - - ._ -- .- - .

I Attachm',nt 1

- - -

  • L1L 175 4

This attachment providas an overview of the design concept.for the

rgency response facilities planned for Three Mile Island Unit 1.

8 Technical Support Center Three Mile Island Unit 1 will have a technical supprt center located in the control building within a two minute walk of the control room. This facility

cations will be in place between the tech support center and other emergency j response fscilitieu including the Unit 1 control room. Information necessary ~ ~

for ossessment af plant status from the technical support. center will-be provided t_

through a computer terminal whfch has access to the plant. computers.

Operations. Support Center An onorations'. support center will be located insida the site boun % ries and will i have communication links to the coner n room and other emergency response facilties.

There will be adequate space in the operations: support center for assembling and assigning personnel.

Emergency Operations Facility The EOF will be located within a ten mile radius of the station. Telephone

i. communications, facsimile facilities' and a computer terminal which has access to the station computers will provide the EOF with information essential in

'~

performing its functions. In addition a computer terminal will aise be provided for accessing environmental infermation necessary for performing offsite radio-lor.ical evaluations.

Backup Emergency Operations Facility i A backup emergency operations facility will be.provided and will be located approximately 10 to 20 miles from the nuclear generating station. The backup i

EOF facility will have the same communications and information links as provided in the EOF.

Technical Functions Support Center A technical functions center will be provided with computer terminal connuni-cations and facsimile links tc the other emergency response facilities. The Technical Functions Support Center will serve as the engineering arm of the other emergency response facilities and will provide access to engineering information and support services as required. The existence of the Technical Functions Support Center will lessen the need for large numbers of personnel serving in a support function capacity in other emergency response facilities.

The Technical. Functions Support Center will be located in the GPU engineering offices in Parsippany, New Jersey.

n w*T'-

-TN-^T1 %i-ew. *T4"7 t'W

  • e1eq W5+-w*w- @wqym *g=i-3 -htw-$ 9 W T T-EMWFW 9dFT'-F***t**yst- ~=-N'1W--WWh.rMMMY'fv-9'T-M7V7 Ve -vle wy yrF'g*'r'y* N(myT* .Wa*"*vv em- w + 9e w-4 w+v