ML19260D998

From kanterella
Revision as of 13:41, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-002/03L-0 & 80-004/03L-0
Date released: 10/01/2019 Download: ML19260D998


LER 80-004/03L-0:on 800109 & 11,radiation Monitor R25B Was Inoperable Due to Drive Belt Coming Off Pump.No Cause Stated.In Both Cases,Belts Replaced & Bolt Tension/Alignment Adjusted
ML19260E005
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/07/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260E005 (1)
LER 80-002/03L-0:on 800109,while Taking Control Room Log Readings,Day Tank Level for Diesel Generator 1C Found to Be Approx 605 Gallons,Below Tech Spec Limit.Caused by Defective Switch on Transfer Pump.Switch Repaired
ML19260E002
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/07/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260E002 (2)
Forwards LER 80-002/03L-0 & 80-004/03L-0
ML19260D997
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/07/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260D997 (1)