Semiannual Fitness for Duty Program Performance Report for the Second Half of 2007
ML080630115
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/25/2008
From: Izard J
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-08002269, STI: 32270880
Download: ML080630115 (4)


Text

Nuclear Operating Company South Texs Pnioect Electric Geneating Station PO 8ox 28.9 Wadsworth, Texs 77483 February 25, 2008 NOC-AE-08002269 1 OCFR26.71 (d)

STI: 32270880 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket No. STN 50-498, STN 50-499 Semiannual Fitness for-Duty Program Performance Report for the Second Half of 2007 Pursuant to 10CFR26.71(d), STP Nuclear Operating Company (STPNOC) submits the attached Semiannual Fitness for Duty (FFD) Program Performance Report for the second half of 2007.

This report covers the period from July 1, 2007 through December 31, 2007.

There are no commitments in this letter.

If you should have any questions on this matter, please contact Ms. Lisa Matula at (361) 972-7444 or Mr. John Izard at.(361) 972-7694.

John Izard

Manager, Compensation/Benefits

& HRIS MK/

Attachment:

Semiannual FFD Program Performance Report for the Second Half of 2007

NOC-AE-08002269 Page 2 of 2 cc:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 7 D1) 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Mohan C. Thadani U. S. Nuclear Regulatory Commission Thad Hill Eddy Daniels Marty Ryan Robert Bailey Steve Winn NRG South Texas LP Ed Alarcon J. J. Nesrsta R. K. Temple Kevin Pollo City Public Service Jon C. Wood Cox Smith Matthews C. Kirksey City of Austin

Attachment NOC-AE-08002269 Page 1 of 2 STPR NUCLEAR OPERATING COMPANY SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE REPORT July 1, 2007 through December 31, 2007 During the second performance period of 2007, the STPNOC FFD Program conducted a total of 616 FFD screening tests that resulted in 7 positive test results. All seven positives were comprised of short-term contractors. STPNOC conducted 440 random tests resulting in a random testing rate of 57% of the average annual population with an annual random testing rate of 51 %.*

STPNOC did not have any 100FR26.73 reportable events during the performance

ýperio~d.

STPNOC did submit a report to the NRC per 100CFR26, Appendix A, section 2.8 e (4),

concerning the HHS certified laboratory reporting a false negative on a blind performance test sample containing amphetamine/methamphetamine. The error was determined to be an inadvertent oversight by the certifying scientist. The lab has taken corrective actions.

Breakdown of Confirmed Positive Tests For Specific Substances Marijuana 5Ong Cocaine opiates Amphetamines Phencyclidine Alcohol Refusal To Test Total Licensee 0

0 0

0 0

0 0

0 Employees Long Term 0

0 0

0 0

0 0

0 Em-ployees Short 3

1 0

1 0

2 0

7 Term Employees Total 31 0

1 0

2 0

J 7

  • Note: STPNOC goal is to achieve an annual random testing rate of at least 50% at the end of 2007.

Attachment NOC-AE-08002269 Page 2 of 2 STP NUCLEAR OPERATING COMPANY FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO IOCFR26 STP Nuclear Operatina Companv December 2007 Period end Company South Texas Project Electric Generating Station Location Lisa H. Matula Supervisor 361-972-7444 Telephone Cutoff: Screen/Confirmation (nglmi)

Marijuana Cocaine Opiates 50/15 300/150 300/300 Amphetamine Phencyclidine Alcohol (%BAC) 1000/500 25/25

.04/.04 Testing Results JLicensee Employ~ees Long Term Contractor 1:Shr r

Cotaco Emnployees Emiployees Average~ #With

<Unesco.rted 19 5

~~Access.

Categories~~~2~

Ae o

ted,ý Catgoie

  1. Teste
  1. Psitive -

~ed

  1. Positiv'e< # Tested,#

Positive~

P re-Access 17070 132 7

Post Accident 2000 2

0 Observed 0

0 2

0 0

0 Behavior Random 344 0

42 0

54 0

Follow-Up 4

0 0

0 0

0 Other 9

0 0

0 1

0 Ttl376 0

51 0

189 7