ML100820307
| ML100820307 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/22/2010 |
| From: | William Jones NRC Region 4 |
| To: | Halpin E South Texas |
| References | |
| 4-2009-055 | |
| Download: ML100820307 (1) | |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 March 22, 2010 Mr. Edward D. Halpin President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
CLOSURE OF INVESTIGATION (OI 4-2009-055)
Dear Mr. Halpin:
This refers to an investigation conducted by the NRCs Office of Investigations regarding activities at South Texas Project. The Office of Investigations initiated the investigation to determine whether a performance technician at South Texas Project Electric Generating Station, Wadsworth, Texas, willfully tampered with a security lock on a delay gate located in the protected area.
Based on the evidence developed during the investigation, testimony, and document reviews, the allegation was not determined to be willful. The NRC plans no further action related to the willful aspect of this allegation and considers this investigation closed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
William B. Jones, Chief Allegations and Enforcement Branch Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80