ML17332A800

From kanterella
Revision as of 02:51, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H
Date released: 05/31/2018 Download: ML17332A800


EDG Load-Run Performance & Reliability During Short & Long Duration Test Periods TER
ML17332A802
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/15/1995
From:
AMERICAN ELECTRIC POWER CO., INC.
To:
References
Download: ML17332A802 (27)
Proposed TS 4.8.1.1.2.e.7,reducing Duration of Surveillance Testing for EDGs During Refueling Operation from 24 H to 8 H
ML17332A801
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/15/1995
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17332A801 (9)
Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H
ML17332A799
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/15/1995
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17332A799 (10)