ML18296A482

From kanterella
Revision as of 12:57, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Entry Criteria-Operability Responsibility Public Meeting Feedback 10-3-18 Final
ML18296A482
Person / Time
Issue date: 10/23/2018
From: John Marshall
NRC/NRR/DSS/STSB
To:
Tilton C
References
Download: ML18296A482 (3)


Text

Operability Inspections Public Meeting #2 Operability Responsibility Entry Criteria Jane Marshall Deputy Director, Division of Safety Systems Office of Nuclear Reactor Regulation

Inspection of Operability

  • The staff understands each licensee has responsibility for Technical Specification operability of Structures, Systems or Components.
  • The Reactor Oversight Process includes inspection of operability decisions.
  • When a deficient Technical Specification Structure, System or Component is deemed operable by an SRO while assessing entry criteria an inspector could evaluate the basis for that decision.

Discussion